Scheduled Maintenance - Daikin DP14UM Service Instructions Manual

Seer ultra-low nox gas electric
Table of Contents

Advertisement

SCHEDULED MAINTENANCE

Package gas units require regularly scheduled maintenance
to preserve high performance standards, prolong the
service life of the equipment, and lessen the chances of
costly failure.
In many instances the owner may be able to perform some
of the maintenance; however, the advantage of a service
contract, which places all maintenance in the hands of a
trained serviceman, should be pointed out to the owner.
HIGH VOLTAGE
DISCONNECT ALL POWER BEFORE SERVICING
OR INSTALLING THIS UNIT. MULTIPLE POWER
SOURCES MAY BE PRESENT. FAILURE TO
DO SO MAY CAUSE PROPERTY DAMAGE,
PERSONAL INJURY OR DEATH.
Once A Month
1. Inspect the return filters of the evaporator unit and
clean or change if necessary.
NOTE: Depending on operation conditions, it may be
necessary to clean or replace the filters more often. If
permanent type filters are used, they should be washed
with warm water and dried.
2. When operating on the cooling cycle, inspect the
condensate line piping from the evaporator coil.
Make sure the piping is clear for proper condensate
flow.
Once A Year
Qualified Service Personnel Only
1. Clean the indoor and outdoor coils.
2. Clean the cabinet inside and out .
3. Motors are permanently lubricated and do not require
oiling. TO AVOID PREMATURE MOTOR FAILURE, DO
NOT OIL.
4. Manually rotate the outdoor fan and indoor blower to
be sure they run freely.
5. Inspect the control panel wiring, compressor
connections, and all other component wiring to be
sure all connections are tight. Inspect wire insulation
to be certain that it is good.
6. Check the contacts of the compressor contactor. If
they are burned or pitted, replace the contactor.
7. Using a halide or electronic leak detector, check all
piping and etc. for refrigerant leaks.
WARNING
8. Check the combustion chamber (Heat Exchanger) for
soot, scale, etc. Inspect all burners for lint and proper
positioning.
9. Start the system, using the proper instrumentation
check gas inlet and manifold pressures, burner flame
and microamp signal. Adjust if necessary.
10. Start the system and run a Heating Performance Test.
If the results of the test are not satisfactory, see the
Servicing sections for the possible cause.
Test Equipment
Proper test equipment for accurate diagnosis is as essential
as regular hand tools.
The following is a must for every service technician and
service shop:
1. Thermocouple type temperature meter - measure dry
bulb temperature.
2. Sling psychrometer- measure relative humidity and
wet bulb temperature.
3. Volt-Ohm Meter - testing continuity, capacitors, motor
windings and voltage.
4. Accurate Leak Detector - testing for refrigerant leaks.
5. High Vacuum Pump - evacuation.
6. Electric Vacuum Gauge, Manifold Gauges and high
vacuum hoses - to measure and obtain proper
vacuum.
7. Accurate Charging Cylinder or Electronic Scale -
measure proper refrigerant charge.
8. Inclined Manometer - measure static pressure and
pressure drop across coils.
Other recording type instruments can be essential in
solving abnormal problems, however, in many instances
they may be rented from local sources.
Proper equipment promotes faster, more efficient service,
and accurate repairs with less call backs.
Heating Performance Test
Before attempting to diagnose an operating fault code, run
a Heating Performance Test to determine if the heating
system is performing within 5% of the BTU input found
on the rating plate of the unit being tested. To conduct a
heating performance test, the BTU input to the unit must
be calculated (see Clocking a Gas Meter). Before clocking
a gas meter, contact your local utility to provide the caloric
value (BTU content) of the natural gas in the area.
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp16um

Table of Contents