Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Z3-DME-03 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Z3 Technology Z3-DME-03

  • Page 1 Version 1.00.04 November 27, 2014 This document contains proprietary and confidential information of Z3 Technology, LLC ("Z3"). This document may not be used, reproduced, disclosed, or disseminated to anyone without the prior written approval of an authorized representative of Z3.
  • Page 2 Formatting, Grammatical Revision. Added Instructions for 1.0.3 11/24/14 Installing the Air Duct 1.0.4 11/27/14 How to insert ribbon cables & screws and nuts changed for fan ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 3: Table Of Contents

    Figure 31 BNC Connector Washer ..................14 Figure 32 BNC Connector Nut .................... 14 Figure 33 Screws for Enclosure ..................14 Figure 34 Back of Assembled Z3-DME-03 ................14 Figure 35 Front of Assembled Z3-DME-03 ................14 ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8...
  • Page 4: 1.0 Required Materials

    Figure 1 Wrong ribbon cable position (2) The ribbon cable on the right should be folded inwards so the folded part will be in between the module ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 5: Figure 2 How To Fix The Ribbon Cable In The Right Position

    *Note: Do not touch the center of the fan Figure 4 Fan Placement Screw holes ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 6: Figure 5 Fan Screw Holes

    Figure 7 Nuts (6) Align the fan wires nicely on the bottom of the enclosure and use tape to hold it in place. ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 7: Figure 8 Taping The Fan Wire

    Figure 10 Location of J15 (9) Reposition the red LED on the Z3-DM8107-APP-21. The LED must be 3mm from the switch. The switch ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 8: Figure 11 Distance From Switch To Led

    (10) Create an air duct by using a piece of clear film. Cut out the duct to match the dimensions in the figure below. *Note: Measurements are in mm Figure 12 Air Duct Dimensions ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 9: Figure 13 Insert Film On Left Side

    (12) Make sure the film is in the correct position (See Figures below). The film should be inserted into the MOD with the APP board. Figure 15 Correct Film Placement Figure 16 Film Placement ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 10: Figure 17 Film Side View

    Figure 17 Film Side View (13) Place the film into the gap of the fan (See Figure Below). Figure 19 Film Placed in Fan Gap ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 11: Figure 20 Incorrect Film Position

    (15) Tuck the cut-out pieces of the film down so they appear like the following Figure. Figure 23 Tucked Film Figure 22 Film Spacing ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 12: Figure 24 Installed Film Side

    (17) Put the top and bottom enclosure together (but not all the way) to check LED alignment. Figure 26 Partial Closing of Enclosure to Check LED Alignment ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 13: Figure 27 Completed Closed Enclosure

    (20) Once the LED and the switch are well positioned, slowly assemble the top and bottom enclosure together. Figure 30 Assembled Top and Bottom Enclosure ___________________________________________________________________________________________ Z3 Technology, LLC ♦ 100 N 8 ST, STE 250 ♦ Lincoln, NE 68508-1369 USA ♦ +1.402.323.0702...
  • Page 14: Figure 31 Bnc Connector Washer

    (22) Use 2x black flat head screws to secure the top and bottom enclosure together. Figure 33 Screws for Enclosure (23) After carefully assembling the Z3-DME-03, the back and front of the end product should look like the following figures.