airquee Active Crocodile Slide Additional Operating Instructions

Advertisement

Quick Links

AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT
YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT.

Site survey:

1. Carry out a survey of the area where the Active Crocodile Slide will be located, and check for
any overhead/underground cables. It's important that this is carried out to avoid ground anchors
penetrating underground services, and the Active Crocodile Slide coming into contact with
overhead cables when inflated.
2. You should provide an adequate power supply to the fan, this should adhere to your local power
regulations.
3. Check wind speed: The industry recommends a maximum wind speed of Force 5 on the
Beaufort scale of 28 - 38 kmph (19-24 mph). Force 5 is a fresh breeze when small trees in leaf
begin to sway.
Version 1.0 12/07/17
Active Crocodile Slide
IMPORTANT
Page 1 of 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Active Crocodile Slide and is the answer not in the manual?

Questions and answers

Summary of Contents for airquee Active Crocodile Slide

  • Page 1 YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT. Site survey: 1. Carry out a survey of the area where the Active Crocodile Slide will be located, and check for any overhead/underground cables. It’s important that this is carried out to avoid ground anchors penetrating underground services, and the Active Crocodile Slide coming into contact with overhead cables when inflated.
  • Page 2 Included with your Active Crocodile Slide: Land Operation The inflatable Repair Kit Electrical Timer Anchor Pegs Manual in its bag Extra equipment needed in addition what is supplied with your inflatable: • Suitable 240v Power Supply to operate the fan Extra equipment you could consider for your new inflatable: •...
  • Page 3 Please see below the anchor points of the unit: 16 GROUND ANCHOR POINTS IN TOTAL FLEXIBLE PIPE INSIDE THE UNIT 2 HP FILLER PIPE (FOR MOUTH MOVEMENT) 1.5HP MAIN Fig. 1 FILLER PIPE Set up: After unfolding the unit please connect the fans as it is shown above: a) the 2 HP fan to the mouth movement filler pipe the 1.5HP fan to the main filler pipe Please note the Mouth Movement filler pipe contains a flexible plastic pipe inside (fig.
  • Page 4 There is a second flexi pipe inside the unit. It is located in the chamber underneath the mouth. Its function is to direct the airflow from the bed into the top parts of the unit. Without this pipe, the head of the crocodile wouldn’t inflate. Before inflating the unit, you must make sure this flexi pipe is connected on both sides, and is fully functional.
  • Page 5 IMPORTANT IT IS IMPERATIVE THAT THE MOVING JAW WILL BE USED ONLY AS A CLIMBING SHEET. THE CHILDREN WHO ARE USING THE UNIT SHOULD BE INSTRUCTED TO KEEP A CONTINUOUS MOVEMENT. For adjusting the timing of the mouth, please follow the instructions below: The electrical timer is designed to turn the fan ON and OFF at user defined intervals.

Table of Contents