Preventive Maintenance - Emerson Leroy-Somer FFB Installation Manual

Table of Contents

Advertisement

4 - PREVENTIVE MAINTENANCE

Consult Leroy-Somer (www.leroy-somer.com: Services/Drive
systems) who in its continuous search for ways to help our
customers, has evaluated numerous methods of preventive
maintenance.
The diagram and table below give the recommended
equipment to use and the ideal positions to take
measurements of all parameters that can affect the operation
of the machine, such as eccentricity, vibration, state of the
bearings, structural problems, electrical problems, etc.
M 01V
3
1
5
M 01H
M 02H
Detector
Measurement
Accelerometer
For measuring vibrations
For measuring speed and
Photo-electric cell
phase (balancing)
For measuring current
Clamp ammeter
(D.C. and 3-phase A.C.)
Multimeter
For measuring voltages
Infra-red probe
For measuring temperature
For measuring insulation
Megohmmeter
resistance
For measuring the coil
Ohmmeter
resistance
Before  conducting  any  work  or  preventive  or 
corrective  maintenance  operations,  please  consult: 
www.leroy-somer.com, 
maintenance.
20
PREVENTIVE MAINTENANCE
M 02V
6
7
4
2
M 02A
M01V M01H M02V M02H M02A Shaft
X
X
manual 
ref. 
5287 
Measurement points
X
X
X
X
X
X
FFB 
E01
E02
E03
X
X
X
X
X
X
X
X
X
X
X
Installation guide FFB brake motors
5286 en - 2015.04 / a
E04
E05
X
X

Advertisement

Table of Contents
loading

Table of Contents