Further details regarding the individual steps
Checking the ignition and ionisation electrodes
Ignition electrodes
3,5
Ionisation electrode
+
0,5
-
Commissioning, inspection, maintenance
1. Check the ignition electrodes and the
ionisation electrode for the correct
gap to the burner gauze assembly,
and for damage (replace if
required).
2. Close the boiler door and tighten the
screws on the boiler door evenly and
diagonally.
(cont.)
17