Operation Instruction; Product Installation; Package Verification; Installation Preparation - Verde VER-EVC-7 User Manual

Table of Contents

Advertisement

2 Operation Instruction

2.1 Product Installation

2.1.1 Package Verification

Unpack to check and verify following items after receiving the charger:
Visual inspection on external appearance. Anything broken or damaged, notify
the seller immediately.
Check accessory type and quantity. If you have received an incorrect type or
quantity, contact the seller at once.

2.1.2 Installation Preparation

1) Tools
Tool Name
Multimeter
Cross Screwdriver
(PH2x150mm,
PH3x250mm)
Insulated Torque Wrench
Electric drill
Diagonal Pliers
2) Cables & Materials
Name
Power supply
cable
Photo
Specification
3*6mm² single-phase power supply
cable
- 8 -
Function
Check electrical
connection and electrical
parameter
Tight the screws
Tight the bolts
Hole on the wall
Cut cables
Quantity
Depend on actual
requirement