Installation Process - Verde VER-EVC-7 User Manual

Table of Contents

Advertisement

2.1.3 Installation Process

1) Installation Notice
a) Electrical device should be installed, operated, serviced, and maintained only by
qualified personnel. No responsibility is assumed by the manufacturer for any
consequences arising out of the use of this device. A qualified person is one who
has skills and knowledge related to the construction, installation and operation of
electrical device and who has received safety training to recognize and avoid the
hazards involved.
b) All applicable local, regional, and national regulations must be respected when
installing, repairing, and maintaining this device.
2) Installation Procedure
1. According to the cases of the attached installation board, drill 3 - Φ 6 * 35 mm
holes on the wall, and insert the expansion pipe;
2. Lock the 2-M4*32mm self-tapping screw into the expansion pipe, and reserve
5mm space;
3. Open the top cover of charger, hang it on the automatic screw, lock it into the
bottom automatic screw, and then cover the sealing cover;
4. Connect the input power cord, close the upper cover, and lock it with 2-
M4*12mm screw.
- 9 -

Advertisement

Table of Contents
loading

Table of Contents