Version 7; Version 14 - gfm GF-16 Instruction Manual

Table of Contents

Advertisement

Version 7

Front extension arms required
Rear extension arm required
Lift range
Maximum Euro-adapter height
Lift capacity (working load) 2 pers. + accessories
Counterweight required for max. load
Counterweight required to balance empty arm
Crane weight (excluding dolly and weights)
Dolly weight (unit weights see page 46)
Arm reach (pivot to camera head mount)
Length of rear end (pivot to outside of bucket)
Continue from § 12, page 6
13. Connect the 200cm / 6' 6" extension number 2 to extension number 1. Slip the
connection flanges into each other and secure with the provided safety pin.
Note:
Section 2 must be supported by a suitable support stand or rostrum.
Tip:
To avoid the sections jamming or getting stuck make sure that the sections
are joined parallel. Using a small amount of lubricant also helps. We suggest
rubbing the joints with an oiled rag prior to assembly.
The "Rigging Harness Assembly" is described on page 9. After reading and
following the instructions, please proceed as follows.
14. Connect 2 turnbuckles to the bottom connection on the front side of the rigging
harness. Ensure that the locking pins are inserted fully.
15. Connect 2 standard rigging rods to the turnbuckles on the front side of the rigging
harness. Ensure that the locking pins are inserted fully.
16. Connect another 2 standard rigging rods to the first 2 standard rigging rods and in
turn to the rigging connectors on section 2. Ensure that the locking pins are inserted
fully.
17. Hand tighten the rods by turning the turnbuckles until the rods are taut, then secure
the turnbuckles with the locking nut as seen on page 9.
Attention:
The rigging system when taut as well as the crane arm, should run in a
straight line and should not bend or dip.
18. Connect the 200cm / 6' 6" extension number 3 to extension number 2. Slip the
connection flanges into each other and secure with the provided safety pin.
Note:
Move the support stand or rostrum to support section number 3.
19. Connect the 200cm / 6' 6" extension number 4 to extension number 3. Slip the
connection flanges into each other and secure with the provided safety pin.
20. Connect a 200cm / 6' 6" parallelogram rod to the parallelogram connection on the
middle section and secure it with the provided safety pin.
21. In turn, connect 3 x 200cm / 6' 6" parallelogram rods to the first parallelogram
connection and secure them with the provided safety pins.
Note:
Support the second and fourth parallelogram rod with the parallelogram
supports located on sections 2 and 4 and secure with the locking pin as
shown on page 10.
GF-16 Crane System Instruction Manual
4 x 200 cm / 6' 6"
1 x 192 cm / 6' 3"
1364 cm / 44' 9"
895 cm / 29' 4"
250 kg / 550 lbs
1274 kg / 2802 lbs
372 kg / 818lbs
841 kg / 1854 lbs
244 kg / 536 lbs
929 cm / 30' 5"
278 cm / 9' 1"
Page: 19

Advertisement

Table of Contents
loading

Table of Contents