Douglas F5 FIXED Series Assembly Instructions Manual

Fixed height basketball system

Advertisement

Quick Links

FIXED HEIGHT BASKETBALL SYSTEM
ASSEMBLY INSTRUCTIONS
WARNING
FAILURE TO COMPLY WITH ANY OF
THE WARNINGS IN THESE INSTRUCTIONS
MAY RESULT IN SERIOUS PERSONAL
INJURY.
FAILURE TO COMPLY MAY ALSO
RESULT IN PROPERTY DAMAGE.
PLEASE HEED ALL WARNINGS AND
CAUTIONS TO ENSURE YOUR SAFETY.
DO NOT ATTEMPT TO ASSEMBLE
THIS SYSTEM WITHOUT CAREFULLY
READING AND FOLLOWING ALL
INSTRUCTIONS. BEGIN BY IDENTIFYING
AND TAKING INVENTORY OF ALL PARTS
USING THE PARTS LIST PROVIDED.
Keep this instruction manual in case you have to contact the manufacturer for replacement parts.
Douglas Industries, Inc.
3441 South 11th Ave.-Eldridge, IA 52748
Telephone: 1-800-553-8907
www.douglas-sports.com
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the F5 FIXED Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Douglas F5 FIXED Series

  • Page 1 READING AND FOLLOWING ALL INSTRUCTIONS. BEGIN BY IDENTIFYING AND TAKING INVENTORY OF ALL PARTS USING THE PARTS LIST PROVIDED. Douglas Industries, Inc. 3441 South 11th Ave.-Eldridge, IA 52748 Telephone: 1-800-553-8907 www.douglas-sports.com Keep this instruction manual in case you have to contact the manufacturer for replacement parts.
  • Page 2 TOOLS AND MATERIALS REQUIRED FOR ASSEMBLY (Not Included) 1. (2) Adjustable Wrenches 10. Concrete-1/2 yard or 14-16 2. Socket Set Bags, (80 lb. bags) 3. 9/16" Wrench 11. Phillips Head Screwdriver 4. 3/4" Wrench 12. A minimum of 2 Ladders 5.
  • Page 3 PARTS LIST Verify all parts listed on packing list are present prior to installation. Contact our Customer Service at 1-800-553-8907 for assistance with replacement of any parts missing or damaged. ITEM DESCRIPTION BASKETBALL SYSTEM COMPONENTS Main Post Main Extension Arm Upper Adjustable Brace Arms Extension Arm Plate Backboard with frame...
  • Page 4 Utility Markings Color Definition Electric Yellow Gas, Oil, Petroleum Orange Communication, Phone, TV Blue Portable Water, Irrigation Green/Brown Sewer One, free easy call gets your utility lines marked White Proposed Dig AND helps protect you from injury and expense STEP 1 FIGURE 1: CONCRETE FOOTING A.
  • Page 5 STEP 2 Line up the top edge of Main Extension Arm Plate with 10’ Line Position the Main Extension Arm (B) to the 10’ Line on Main post (A) as shown in Figure 4 Connect Main Extension Arm (B) to Main Post (A) with one Extension Arm Plate (D), using six 5/8”...
  • Page 6 STEP 4 Remove the screws on Rim spring box cover, o pen the Spring box. (Rim Spring Box cover may not be factory-assembled.) Slide 4 Carriage bolts M10x 4.33” (R1-rim hardware kit) thru Rim plate, Spacers and Backboard, secure with 4 Flat washers M10 (R2-Rim hardware kit ) and 4 Flange nuts M10 (R3-Rim hardware kit ) from the backside of Backboard.

Table of Contents