Download Print this page

Inter-fab EDGESTONE SLIDE ROCK Installation Manual

Rock panel

Advertisement

Quick Links

EDGESTONE SLIDE ROCK
Rock Panel Installation Guide
1.
Install White Water slide per installation instruc-
tions prior to attachment of the Edgestone Slide Rock
panels. Legs should be plumb and step should be set at
16 degrees slope.
IMPORT NT: Correct step slope is
critical to ensure proper fit of the Slide Rock Panels.
2B.
Use the relief line along step section to help with panel
positioning.
7900 ES Slide Rock Rev. 09/10
8 0 0 . 7 3 7 . 5 3 8 6
2 .
Front panel installation (toward pool). Position the
front panel along the slide. Make sure the panel does not
extend over the pool edge. Starting at the step, make sure
the panel fits correctly down the length of the flume.
2C.
The rear of the panel has a cut out of the step to
deck mounting bolt head.
3050 S.
LVERNON W Y
TUCSON,
Z 85713

Advertisement

loading
Need help?

Need help?

Do you have a question about the EDGESTONE SLIDE ROCK and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Inter-fab EDGESTONE SLIDE ROCK

  • Page 1 Install White Water slide per installation instruc- Front panel installation (toward pool). Position the tions prior to attachment of the Edgestone Slide Rock front panel along the slide. Make sure the panel does not panels. Legs should be plumb and step should be set at extend over the pool edge.
  • Page 2 EDGESTONE SLIDE ROCK Rock Panel Installation Guide - cont. Once the panel is in position, start at the step and work The screws are self tapping, so no pilot holes are down the flume to attach the panel to the slide using a 5/16”...