3. INSTALLATION

IMPORTANT! READ ALL RELEVANT MANUALS AND SAFETY PRECAUTIONS CAREFULLY
BEFORE STARTING TO UNPACK AND INSTALL THE EQUIPMENT!
NOTE! MAKE SURE INSTALLATION IS CARRIED OUT BY SUITABLY TRAINED
PERSONNEL.
 The support roller is shipped with fully assembled condition.
 The location for installation should be level and able to take the required loading without
subsequent soil settlement.
 Recommended lifting method by 2 lifting hooks via lifting lugs provided on both sides of the
support roller, use the 2 lifting lugs nearer to the table only.
 Machine is ready for power "ON".
 Adjust the wheels position to meet the large diameter pipe.
3.1 Handling and Storage of the Machine
The machines are packed on a base, suitable for lifting by crane and/or forklift. Lift the
machine from the lifting points (lifting loops) only.
Unload the machine from the packing and check the outer condition. Do not store the
machine outside or in damp places.