Table of Contents

Advertisement

4.6 BURNER START-UP CYCLE

Normal
1 st stage thermostat
2 nd stage thermostat
Motor
Ignition transformer
1 st stage valve
1 st stage flame
2 nd stage valve
2 nd stage flame
Lock-out lamp
B
Lock out is indicated by a lamp on the control box (4, fig. 1, page 1).
5.

MAINTENANCE

Burner requires a periodic maintenance carried out by a qualified and authorized technicians.
Maintenance is essential for the reliability of the burner, avoiding the excessive consumption of fuel and
consequent pollution.
Before carrying out any cleaning or control always first switch off the electrical supply to the
burner acting on the main switch of the system.
THE BASIC CHECKS ARE:
Check that there are not obstructions or dents in the supply or return oil pipes.
Clean the filter in the oil suction line and in the pump.
Clean the
photoresistance,
Check for correct fuel consumption.
Replace the nozzle (see fig. 12, page 6) and check the correct position of electrodes (fig. 13, page 7).
Clean the combustion head in the fuel exit area, on the diffuser disc.
Leave the burner working without interruptions for 10 min. and check the right settings at 1
stage of all components stated in this manual. Then carry out a combustion check verifying:
Smoke temperature at the chimney;
Smoke value according to opacity smokes index according to Bacharach scale
20024120
~
12s
3 – 28s
(8, fig. 1, page 1).
Content of CO
Lock-out due to failure to light
~
12s
( % );
Content of CO (ppm);
2
8
GB
B
5s
D6040
st
nd
and 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

397 t1

Table of Contents