Download Print this page
Best Barns Hampton Assembly Book
Hide thumbs Also See for Hampton:

Advertisement

Quick Links

Best Barns USA
Assembly Book
Revised January 26, 2022
;)#*3#(0%<#B2
the Hampton
C@D%E%@AD
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@@

Advertisement

loading
Need help?

Need help?

Do you have a question about the Hampton and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Best Barns Hampton

  • Page 1 Best Barns USA Assembly Book Revised January 26, 2022 ;)#*3#(0%<#B2 the Hampton C@D%E%@AD Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4...
  • Page 2 MPORTANT NFORMATION BOUT !"'(N .,) 9,/ -)/+"'$#(0 ,)/ N#14 L*2'$2 /2'3 1"2 9,**,6#(0 #(9,/&'1#,( 829,/2 820#((#(0 +,($1/)+1#,(4 J*6'.$%+"2+N%6#1"%.,)/%*,+'*%QRJ%,/%8)#*3#(0%+,32%,99#+2%9,/%'(.%/2O)#/2&2(1$%,/%/2$1/#+1#,($4 H*,,/S ],,3%9*,,/#(0%#$%$,*3%,-1#,('**.4%^,)%&'.%+",,$2%1,%8)#*3%.,)/%,6(%,/%-,)/%'%+2&2(1%-'34 Always wear safety glasses when cutting or nailing! !,,*$%:2O)#/23S Q'(3%,/%?#/+)*'/%<'6 U2V2* <'921.%Z*'$$2$ ?,/3*2$$%T/#** G2'$)/#(0%!'-2 T)$1%G'$N Q'&&2/ WDFID%U'332/X$Y L"#**#-$%<+/263/#V2/ L2(+#* H/'&#(0%<O)'/2 J33#1#,('* G'12/#'*$ F Not included in kit: :2O)#/23S <"#(0*2$%,/%&21'*%/,,9#(07%T/#-%M3027%:,,9#(0%['#*$%,/%<+/26$7%L'#(1 R-1#,('*S ?')*N7%:#302%\2(1...
  • Page 3 Details for Optional Deluxe Floor System H,)(3'1#,(%$#B2%#$%C@DFAd%E%@ADFAd4%%?"2+N%*,+'*%8)#*3#(0%+,32$%#(%.,)/%'/2'7%1"2%+,($1/)+1#,(%&'. "'V2%1,%+"'(024%%H,/%'%+,(+/212%$*'87%#($1'**%$#**%$2'*2/%'$%'%&,#$1)/2%8'//#2/%821622(%1"2%+,(+/212 '(3%1"2%6'**%-*'12$4%%H,'&%$#**%$2'*2/%+'(%82%-)/+"'$23%'1%",&2%+2(12/$%#(%/,**$%iFCh@d%,/%6#32/4 C4 <1'002/ 1"2 `E` 1#&82/$ '$ $",6( 82*,64 ?)1 X@Y 16, @E`F ID 8,'/3$ #(1, @D *,(0 8*,+N$ 1,%$2+)/2%1"2%`E`$%6"2/2%1"2.%8)11%1,021"2/4 15-1/4" 16" 16" @4 ?)1%X@Y%16,%@E`FID%1,%'%*2(01"%,9%ID%FAd4%%!"2. 6#** 82 )$23 9,/ 1"2 b,#$1 "2'32/$4 U'.,)17 9/,& *2917 9,/ CWd ,( +2(12/ b,#$1 $-'+#(04 DeD &'/N$ 6"2/2%9*,,/%b,#$1%6#**%82%-*'+234 i4 ?)1%XCfY%$2V2(122(%@E`FC@D%1/2'123%8,'/3$%1,%CCD%F_d4%!"2$2%6#**%82%1"2%9*,,/%b,#$1$4%Treated...
  • Page 4 Step 1 Assemble 12' Back Wall Wall Plate C``d C4 ?)1 X@Y 16, @E`FC@D 1, ' *2(01" ,9 C``d4 L,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3 #(3#+'12 6#1" DeD &'/N$ 6"2/2 1"2 24" 6'**%$1)3$%6#**%82%*,+'1234 23-1/4" 24" 144" Wall Plate Pre-Cut Wall Studs Depending on your location pre-cut wall studs vary in length from 92-1/4"...
  • Page 5 Step 2 Assemble 10' Side Wall Frames C4 ?)1%X@Y%16,%@E`FCAD%8,'/3$%1,%'%*2(01"%,9%CCWFCh@d4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3%#(3#+'12 6#1"%DeD%%&'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 G'/N%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/N$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 Wall Plates %CCWFCh@d Top Wall Plate Bottom Plate 24" 24" 19-3/4" Stud Spacing i4 =($1'** XWY $#E -/2F+)1 6'** $1)3$ 821622( 1"2 1,- a 8,11,& -*'12$ 6#1" X@Y 16, CA3 $#(N2/$ ,( 2'+"%2(34 Pre-Cut Wall Studs...
  • Page 6 Step 4 Assemble 68-1/2' Side Wall Frames C4 ?)1%X@Y%16,%@E`FID%1,%'%*2(01"%,9%WIFCh@d4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DeD %&'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 G'/N%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/N$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 Wall Plates %WIFCh@d 24" 24" 19-3/4" i4 =($1'**%X`Y%9,)/%-/2F+)1%6'**%$1)3$%821622(%1"2%1,-%a%8,11,&%-*'12$%6#1"%CA3%$#(N2/$4 Pre-Cut Wall Studs 68-1/2" Wall Plate `4 :2-2'1%1,%'$$2&8*2%'(,1"2/%WIFCh@d%*,(0%6'**%9/'&24%!"2%$#3#(0%6#**%82%'--*#23%'912/%1"2%6'**$ '/2%$21%,(%1"2%9*,,/4...
  • Page 7 Step 5 Assemble 96" Side Wall with Door C4 L,$#1#,(%X@Y%16,%_Wd%*,(0%8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DeD%%&'/N$%6"2/2%1"2%6'** $1)3$%6#**%82%*,+'1234 23-1/4" 23-1/4" 37" Door Opening 28" 28" @4 =($1'**%XWY%$#E%-/2F+)1%6'**%$1)3$%821622(%1"2%6'**%-*'12$4 i4 ?)1%X@Y%16,%-/2F+)1%6'**%$1)3$%1,%'%*2(01"%,9%IiFCh@d%'(3%#($1'**%'$%"2'32/%$)--,/1$ ,(%2'+"%$#32%,9%1"2%3,,/%,-2(#(07%see detail below4%['#*%1,%$1)3$%6#1"%CA3%$#(N2/$4 Pre-built Door Header Cut 2x4 Blocks to Fit packed in dormer kit 2x6 Door Header 83-1/2"...
  • Page 8 Step 6 Assemble Front Wall Frame C4 ?)1 X@Y 16, @E`FC@D 8,'/3$ 1, ' *2(01" ,9 C``d 9,/ 6'** -*'12$4 L,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3 #(3#+'12%6#1"%DeD%G'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 Install these Studs Centered 32-1/4" 32-1/4" @4 =($1'**%XWY%$#E%-/2F+)1%6'**%$1)3$%821622(%1"2%6'**%-*'12$%6"2/2%$",6(4 i4 ?)1%X@Y%16,%-/2F+)1%$1)3$%1, 2x4 Blocks ' *2(01" ,9 fKFCh@d '(3 #($1'** nail nail 2x8 Door Header...
  • Page 9 Step 7A Set Walls C4 M/2+1%8'+N%6'**%'(3%CAD%$#32%6'**%9/'&2$4% =($1'**%1"2%$#32%6'**%9/'&2$%6#1"%1"2 IMPORTANTS% D?D%&'/N$%,/#2(123%'0'#($1%1"2%8'+N%6'**%-'(2*%'(3%9/,(1%6'**%+,/(2/4%<2+)/2%6'**$%1,021"2/%'1 1"2%+,/(2/4%5$2%X`Y%9,)/%CA3%$#(N2/$%+,/(2/4%;/'+2%6'**$%6#1"%-/2F+)1%6'**%$1)3$%1,%",*3%6'**$ $2+)/2%'(3%-*)&84 @4 <1'/1#(0 '1 /#0"1 +,/(2/ #($1'** ' 9)** 6#31" $#3#(0 -'(2* 6#1" 1"2 DUJLD 2302 9*)$" 6#1" 1"2 $#3#(0 ,(%8'+N%6'**4%<#3#(0%$",)*3%2E12(3%ih`d%82*,6%8,11,&%-*'124%['#*%$#3#(0%1,%8'+N%6'**%'(3%'** @E`$%)$#(0%W3%0'*V4%('#*$%$-'+23%Id%'-'/14 Tip: If you are erecting building on a wood floor insert nails between the 3/4"...
  • Page 10 Step 7B Set Walls continued `4 M/2+1 1"2 9/,(1 3,,/ 6'** -'(2* '(3 1"2 XiY 1"/22 $#32 6'** 9/'&2$4 IMPORTANTS =($1'** 1"2 WIFCh@d *,(0 $#32 6'** 9/'&2$ 6#1" 1"2 D?D &'/N$ ,/#2(123 '0'#($1 1"2 8'+N '(3 9/,(1 6'** -'(2*$4 <2+)/2 6'**$ 1,021"2/ '1 1"2 +,/(2/$4 5$2 X`Y 9,)/ CA3 $#(N2/$ -2/ +,/(2/4 ;/'+2 6'**$ 6#1" -/2F +)1%6'**%$1)3$%1,%",*3%6'**$%$2+)/2%'(3%-*)&84 K4 <1'/1#(0 '1 *291 +,/(2/ #($1'** ' 9)** 6#31"...
  • Page 11 Step 8 Install 2x4 Tie Plates C4 =($1'** ' @E`FID ,( 1"2 $#32 6'** 6#1",)1 3,,/7 9*)$" 6#1" 1"2 @E` ,( 1"2 8'+N 6'**4 =($1'** ' @E`F C@D 9*)$" 6#1" 1"2 @E` ,( 1"2 9/,(1 6'**4 ?)1 *2(01" 1, 9#14 5$2 CA3 $#(N2/$ 1, $2+)/2 1"2 1#2 -*'12$ 1,%9/,(1%'(3%8'+N%6'**$%'(3%'*,(0%*2(01"4 @4 :2-2'1%1,%#($1'**%@E`$%,(%1"2%$#32%6'**%6#1"%3,,/4 i4 ?)1 X@Y 16, C@D *,(0 @E`$ 1, 9#1 821622( $#32 6'** 1#2 -*'12$ '(3 #($1'** ,( 9/,(1 '(3 8'+N 6'**$4...
  • Page 12 Step 10 Install Loft Floor Important: Before securing the 2x4 floor joists make sure the side walls are plumb. The building width should be 12'-0" measuring from the outside of the 2x4 tie plates. ?)1%X_Y%(#(2%@E`FC@D%8,'/3$%1,%'%*2(01"%,9%Cifd%'(3%#($1'**%#( 1"2%&21'*%"'(02/$4%5$2%CFCh@d%"'(02/%('#*$4 Step 11A Install Loft Floor Sheathing Before installing floor sheathing consider where to locate the 2' x 4' access opening.
  • Page 13 Step 11B Install Loft Floor Sheathing continued C4 U,+'12%X`Y%9,)/%iFCh@d%E%@`d%R<;%9#**2/$4%=($1'**%'1%9/,(1%'(3%8'+N%+,/(2/$%,(%1,-%,9%@E`%1#2 -*'12$4%5$2%X`Y%9,)/%W3%+,&&,(%('#*$%2'+"4%=($)/2%1"2%$-'+2%821622(%9#**2/$%#$%_Wd4 @4 =($1'** *,91 9*,,/#(0 821622( R<; 9#**2/$4 M302 ,9 $"2'1"#(0 $",)*3 82 9*)$" 6#1" 9/,(1 '(3 8'+N 6'** 1#2 -*'12$4 :292/ 1, 1"2 $)002$123 *'.,)1 ,( -/2V#,)$ -'024 =($1'** 9*,,/#(0 )$#(0 W3 +,&&,( ('#*$%$-'+23%C@d%'-'/14 Back 96"...
  • Page 14 Step 13A Assemble Gables C4 Z'1"2/%-/2F8)#*1%0'8*2%2(3%9/'&2$7%XCY%,(2%*291%'(3%XCY%/#0"17%XCY%,(2%`_FCh@d%*,(0%@E`%'(3%X@Y 16,%i@FCh@d%*,(0%@E`$%6#1"%'(0*23%2(3$4 @4 L,$#1#,(%1"2$2%+,&-,(2(1$%1,021"2/%'$%$",6(%82*,64%]"2(%'*#0(23%+,//2+1*.%1"2%8,11,&%@E`$ 6#**%82%$1/'#0"1%'(3%&2'$)/2%C@DFAd%9/,&%2(3%1,%2(34%Pre-built gable ends highlighted in gray. i4 !2&-,/'/#*.%1'+N%CE`%8*,+N$%1,%*,91%9*,,/#(0%'/,)(3%1"2%9/'&2%&2&82/$4%!"2$2%8*,+N$%6#**%82 IdFC@d *,(0 '(3 &'. "'V2 '(0*23 2(3$4 G'N2 $)/2 X@Y 16, ,9 1"2$2 8*,+N$ '/2 -,$#1#,(23 #($#32 2'+"%-/2F8)#*1%0'8*2%2(3%9/'&2%'$%$",6(4%L,$#1#,(%1"2%/2$1%,9%1"2%8*,+N$%'--/,-/#'12*.%$-'+23 1,%",*3%@E`$%#(%-*'+24%!"2$2%6#**%#($)/2%1"'1%'**%1/)$$2$%'(3%0'8*2$%'/2%8)#*1%2E'+1*.%1"2%$'&24 TR%[R!%('#*%8*,+N$%1,%0'8*24 `4 <2+)/2%1"2%8,11,&%@E`%1,%1"2%0'8*2%$1)3%)$#(0%X@Y%16,%@FCh@d%$+/26$4 K4 U,+'12 X@Y 16, KFih`dEC`d R<; 0)$$21$4 J11'+" 1"2$2 1, 1,- ,9 2'+" 0'8*2 $1)3 1, $2+)/2 9/'&2 1,%i@FCh@d%@E`$4%5$2%W3%+,&&,(%('#*$4%<22%T21'#*%DJD4 5-3/4"x14"...
  • Page 15 Step 13B Assemble Gables Continued K4 U,+'12 X@Y 16, KAFih`d *,(0 @E`$4=($1'** 1"2$2 2O)'**. $-'+23 9/,& +2(12/ ,9 1"2 0'8*24 <2+)/2 1"2 8,11,& @E` 1,%1"2%0'8*2%$1)3$%)$#(0%X@Y%16,%@FCh@d%$+/26$%2'+"4 5-1/2"x27-3/4" Gusset W4 =($1'**%'%6,,3%0)$$21%'1%-2'N4 J--*.%0*)2%821622(%@E`$%'(3 0)$$21 '(3 ('#* )$#(0 XC`Y 9,)/122( W3%+,&&,(%('#*$4 f4 U,+'12%X@Y%16,%KFCh@dE@fFih`d 0)$$21$4 J11'+" 1"2$2 1, 1,- ,9 2'+" 0'8*2 $1)3 1, $2+)/2 1, 1"2 i@FCh@d @E`$4%5$2%W3%+,&&,(%('#*$4 50-3/4"...
  • Page 16 Step 14B Install Gable Siding continued i4 =($1'**%+2(12/%$#3#(0%-'(2*4%U,+'12%$)(8)/$1%6#(3,67%packed in dormer carton7%'(3%+)1%,)1 $#3#(0 '++,/3#(0 1, 6#(3,6 #($1/)+1#,($4 =1 #$ '3V#$'8*2 1, #($1'** 1"2 6#(3,6 '912/ 0'8*2 #$ $214 `4 =($1'**%*'$1%$#3#(0%-'(2*4 Step 15 Install Gable Overhang C4 U,+'12%X@Y%16,%ffFihId%*,(0%@E`%/'912/$%,(%0'8*24%=($1'**%@E`$%9*)$"%6#1"%1"2%1,-%,9%0'8*2 9/'&24%5$2%CA3%$#(N2/$4 @4 U,+'12%X@Y%16,%iAFCh`d%*,(0%@E`%/'912/$%'(3%#($1'**%1,%9#(#$"4%@E`$%6#**%2E12(3%82.,(3%2(3%,9 0'8*24 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled.
  • Page 17 Step 16 Set Front Gable Important: Temporarily brace the gables with 2x4s to secure gables until the roof sheathing is installed! C4 =($1'**%0'8*2%,(%1"2%9/,(1%6'**4%<2+)/2%8,11,&%,9 0'8*2 1, *,91 9*,,/ '(3 R<; 9#**2/$ )$#(0 CA3 $#(N2/$4 @4 ['#* 1"2 8,11,& 2302 ,9 1"2 $#3#(0 #(1, 1"2 CE` 1/#&4 5$2%W3%0'*V4%('#*$4 Bottom edge of gable siding extends over 1x4 trim...
  • Page 18 Step 19A Set Trusses C4 <1'/1#(0 '1 8'+N 0'8*2 $21 ' 1/)$$ 8. $*#3#(0 2(3$ ,V2/ @E` 9*,,/ b,#$14 !/)$$ 2(3$ $",)*3 $21 9*'1 '1,-%9*,,/%b,#$14%<2+)/2%6#1"%XCAY%12(%W3%+,&&,(%('#*$%,(%8,1"%$#32$4 @4 ?,(1#()2%$1'(3#(0%1/)$$2$%1,%9/,(1%,9%8)#*3#(04%G'N2%$)/2%1/)$$2$%'(3%0'8*2$%'/2%-*)&84%=9 (2+2$$'/.%$-'(%'%@E`%'+/,$$%1,-$%'(3%1'+N%1,%N22-%-*)&8%)(1#*%/,,9%$"2'1"#(0%#$%#($1'**234 2x4 Block 1st Truss 2nd Truss Cut to Fit 3rd Truss (!0) ten 6d common nails on both side i4 U,+'12%1"2%@E`%1"'1%6'$%+)1%'(3%/2&,V23%9/,&%1"2%3,,/%,-2(#(0%,(%1"2%C@D%2(3%6'**4%G2'$)/2 '(3%+)1%1,%*2(01"%'%@E`%1,%9#1%821622(%1"2%0)$$21$%,(%1"2%@(3%'(3%i/3%1/)$$2$4...
  • Page 19 Step 19B Set Trusses continued `4 ?)1%1,%*2(01"%'(3%#($1'**%'(,1"2/%@E`%821622(%1"2%1/)$$%0)$$21$%6"2/2%$",6(%82*,64 2x4 Block 7th Truss Cut to Fit 8th Truss Step 20 Install Side Wall Trim It's easier to install the soffit if the corner and side wall trim are installed first. This enables the soffit to rest on the trim where it meets the building. See lower detail. C4 U,+'12 ' ihId E id E Id $#3#(0 0')02 8*,+N -'+N23 #( 1"2 "'/36'/2 8'04 L*'+2 1"#$ 0')02 8*,+N )(32/ 1"2 @E` ,V2/"'(0 '(3 8)11 ' __d *,(0 CE` 1/#&...
  • Page 20 Step 21 Install Soffit C4 U,+'12 ' _Fih`d E `Id $,99#1 -'(2*4 G2'$)/2 9/,& +2(12/ ,9 9#/$1 1/)$$ 1, 9'+2 ,9 1"2 @E` #($1'**23 ,(%1"2%9/,(1%0'8*24%G'/N%1"#$%*2(01"%9/,&%1,(0)2%2302%$#32%+)1%,99%DUJLD%2302%2(3%,9%-'(2*4 @4 ['#*%1"2%$,99#1%-'(2*%1,%1"2%2(3%,9%1"2%@E`$4%<22%Detail 'C'%82*,64 i4 =($1'**%XKY%9#V2%_Fih`d%E%`Id%$,99#1%-'(2*$%'*,(0%1"2%$#32%,9%1"2%8)#*3#(0%+)11#(0%1"2%*'$1%$,99#1 -'(2*%9*)$"%6#1"%1"2%@E`%,(%1"2%/2'/%0'8*24 `4 :2-2'1%1,%#($1'**%$,99#1%-'(2*$%,(%1"2%,--,$#12%$#32%6'**4 Tongue Edge at Center of Truss LAP Edge is cut off Detail 'C' Soffit 1x3 - 72"...
  • Page 21 Step 22 Install 1x6 Fascia on Side Walls C4 <1'/1#(0%'1%1"2%8'+N%0'8*27%#($1'**%'%fKd%*,(0%CEW%1/#&%8,'/3%9*)$"%6#1"%1"2%9'+2%,9%1"2%@E`4 =($1'**%1"2%CEW%8,'/3%$,%1"2%1,-%,9%1"2%8,'/3%#$%'*#0(23%6#1"%1"2%1,-%,9%1"2%1/)$$2$4%!"2%/,,9 $"2'1"#(07%installed later7%$",)*3%/2$1%,(%1"2%9'$+#'4%5$2%'%$1/'#0"1%2302%'$%$",6(%82*,64%5$2 W3%0'*V4%('#*$4 @4 =($1'**%X@Y%16,%CEWFWD%1/#&%8,'/3$%(2E14 i4 ?)1 ' `Id *,(0 CEW 1/#& 8,'/3 9*)$" 6#1" 1"2 ,)1$#32%@E`%,(%1"2%9/,(1%0'8*24 `4 :2-2'1%,(%,--,$#12%$#32%6'**4 Flush with 2x4 Straight Edge Soffit Step 23A Install Roof Sheathing C4 U,+'12%X@Y%`IdE%_Wd%$"221$%,9%R<;4%?)1%9/,&%1"2$2%X@Y%16,%`IdE%KCd%$"221$4%H/,&%3/,-$%+)1 X@Y%16,%`IdE%@fd%$"221$4 @4 U,+'12%X@Y%`IdE_Wd%$"221$%,9%R<;4%?)1%1"2$2%#(%"'*9%1,%&'N2%X`Y%9,)/%`IdE`Id%$"221$4...
  • Page 22 Step 23B Install Roof Sheathing continued `4 ]"2(%#($1'**#(0%$"221$%'1%9/,(1%0'8*2%+)1%9*)$"%6#1"%1"2%@E`$%,(%1"2%0'8*24 K4 =($2/1%X@Y%16,%-*.F+*#-$%#(1,%1"2%/,,9%$"2'1"#(0%821622(%2'+"%1/)$$%'1%1"2%1,-%/,67 $22%3/'6#(0%82*,64 W4 ?)1%'%K_FCh`d%-#2+2%,(%1,-%/,6%$,%1,%82%9*)$"%6#1"%9/,(1%0'8*2%@E`$4 f4 T212/&#(2%*,+'1#,(%9,/%3,/&2/$%'(3%9,**,6%#($1/)+1#,($%#(%3,/&2/%N#14 Insert (2) two ply-clips into the roof sheathing between each truss at the top row Plyclip Cut 59-1/4" to fit 51" 48" x 27" Cut From 48"...
  • Page 23 Step 24 Install Gable Trim C4 R(%9/,(1%0'8*2%#($1'**%X@Y%16,%CEW%1/#&%8,'/3$%,V2/%1"2%@E`%8,'/3$7%9*)$"%6#1"%1"2%1,-%,9 1"2%R<;%/,,9%$"2'1"#(04%5$2%W3%0'*V4%('#*$4 @4 =($1'**%0'8*2%1/#&%,(%1"2%/2'/%0'8*24 1x6 Gable Trim 82" Long 1x4 Door Trim Install Trim 3/4" above Opening Tack 78-1/4" Long 1x4 Door Trim i4 =($1'** '( I@d *,(0 CE` 1/#& 8,'/3 +2(12/23 '8,V2 3,,/ ,-2(#(04 =($)/2 8,'/3 #$ '8,V2 ,-2(#(0 8. ih`d4 5$2%W3%0'*V4%('#*$4 `4 =($1'** fIFCh`d *,(0 CE` 1/#&...
  • Page 24: Install Doors

    Step 26 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening.
  • Page 25 Install Roofing — Not Supplied in Kit C4 =($1'**%&21'*%/,,9%D3/#-D%230#(0%'*,(0%1"2%-2/#&212/ ,9%1"2%/,,94 Metal Roof Edge Roof Sheathing @4 =($1'** $"#(0*2$ '++,/3#(0 1, 1"2 #($1/)+1#,($ Optional Roof Covering ,(%1"2%6/'--2/4%=9%.,)%(223%&,/2%321'#*23 83*4 %:,,9%<"#(0*2$ #($1/)+1#,($ ,( #($1'**#(0 $"#(0*2$7 1"2/2 '/2 0,,3%-)8*#+'1#,($%'(3%5F!)82%V#32,$ -+$4 %:,,9%D3/#-D%M302FCAD...
  • Page 26 Qty. Material Shipped in 4' Extension Kit !/)$$%:'912/$ @E` ffFihId !/#&%;,'/3$ !/#&%;,'/3$ :#302%;*,+N @E` CIFCh@d L/2F8)#*1%!/)$$%J$$2&8*#2$%F%*291"'(3 L/2F8)#*1%!/)$$%J$$2&8*#2$%F%/#0"1"'(3 L/#&23 <,99#1 ;,'/3$ ihId E _Fih`dE `IFih`d R<;%<"2'1"#(0%%%%%%%%%fhCWd%E%%_Fih`dE%`Id ],,3%Z)$$21$ CKFih`d%E%@fFCh@d g,#$1%Q'(02/$ 2'4%fhCWd%L*.+*#-$ *84%CA3%<#(N2/$ *84%W3%?,&&,(%['#*$ *84%W3%Z'*V4%['#*$ Qty. Material Shipped in Trim Carton CEi%%E%__d%?,/(2/%%!/#& CE`%%E%__d%?,/(2/%%!/#& CEWd%E%CA`d%Z'8*2%!/#&...
  • Page 27 j1.4 Material Packaged on Pallet j1.4 Material Packaged on Pallet !/)$$%:'912/$ ffFihId fhCWd `Id%E%@`d%R<;%<"2'1"#(0 @%[,1%)$23%#(%1"#$%&,32* fhCWd `Id%E%KCd%R<;%<"2'1"#(0 :#302%;*,+N CIFCh@d fhCWd `Id%E%`Id%R<;%<"2'1"#(0 Z'8*2%RV2/"'(0 iAFih`d fhCWd `Id%E%fKd%R<;%<"2'1"#(0 @%[,1%)$23%#(%1"#$%&,32* fhCWd _Fih`d%E%`Id%R<;%<"2'1"#(0 Z'8*2%:'912/$ i@FihId fhCWd _Fih`d%E%KCd%R<;%<"2'1"#(0 Z'8*2%L*'12$ `_FCh@d fhCWd _Fih`d E K_FCh`d R<; <"2'1"#(0 Z'8*2%<1)3$ KAFih`d fhCWd...