Navien NFB-175H Installation Manual page 73

Condensing boilers
Hide thumbs Also See for NFB-175H:
Table of Contents

Advertisement

System Application #1- Cascade System with Closely Spaced Tees
Supply
Cold water
Backflow preventer
Expansion tank
Return
Connect the "SH Demand (SH T/T or Zone controller)" to the main unit.
Note
Connect the supply/return sensors to SUPPLY and RETURN terminals of the CNT1/2 terminal strip
on the main unit PCB.
Connect the outdoor sensor (optional) to the main unit.
Install system pumps to the units (main and sub) as required by the system configuration. When
configuring a cascade system, the output of the zone pumps installed at the main and sub units
are used as the output of the secondary system pump.
Connect zone pumps to the zone controller. Do not connect zone pumps to the main or sub units.
System Application #2- Cascade System with Hydro Separator
Return
Temperature
sensors (required)
Dirt collector
Hydro/Air separator
Connect the "SH Demand (SH T/T or Zone controller)" to the main unit.
Note
Connect the supply/return sensors to SUPPLY and RETURN terminals of the CNT1 terminal strip on
the main unit PCB.
Connect the outdoor sensor (optional) to the main unit.
Install system pumps to the units (main and sub) as required by the system configuration.
Connect zone pumps to the zone controller. Do not connect zone pumps to the main or sub units.
Air separator
Temperature
12" (30 cm)
sensors (required)
maximum
Supply
Main
Sub1
Main
Sub1
Cold water
Backflow preventer
Expansion tank
Installing a Cascade System
Sub2
Sub2
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nfb-200h

Table of Contents