Download Print this page

Advertisement

Offset Laser Alignment:

In cases where there is a difference in sheave/pulley wall thickness, us e the included
mechanical divider t oo l, flat washers and double sided ma g ne t ic targets.
1. Place a B.A.T. Laser Tool on the "Offset" or the pulley with the widest rim face.
2. Using two of the double sided ma g n e t ic targets, Then affix these assemblies to
two of the magnets on the B.A.T. Laser Tool. Choose the two opposing magnets
that best fit the size of your sheave face. Affix the B.A.T., Target assembly onto the
opposing sheave face.
3. Now on the offset sheave measure the "Offset". Using the provided dividers,
measure from the center of the 1st sheave groove to the center white line of the
B.A.T. This measurement is the "Offset Value".
4. Using this "Offset Value" place the dividers o n the center of the opposing
Sheave 1st sheave groove and observe which line on the B.A.T. system the dividers
point to. This is the desired target line for proper sheave alignment.
5. Now Align as described in Dual Crossfire Procedure.
6. CAUTION! REMOVE B.A.T. LASERS and TARGETS BEFORE ENERGIZING MACHINERY!
Toll Free: 800.997.4467|
8
alignmentsupplies.com

Advertisement

loading

Related Products for BAT RC-1-110GB

This manual is also suitable for:

Asi-2-210gb