Download Print this page

Advertisement

How to Use

Belt Alignment Pre-Check:
1. Observe all safety procedures, de-energize lock out and tag out equipment to
be aligned. Verify lock out, and follow all applicable plant safety policies and
procedures.
2. Make sure equipment is at "ZMS" or Zero Mechanical State.
3. Inspect machinery for wear, looseness, deterioration, cracking, etc.
4. Inspect bases, foundations, and motor bolts for soft foot conditions.
5. Check pulley/sheaves, and drive belts for wear and replace as required.
6. Check sheave/pulley's for wobble and run-out notes. The B.A.T.Belt
Alignment Tool® c a n be used to indicate drive system defects.
6
Toll Free: 800.997.4467|
alignmentsupplies.com

Advertisement

loading

Related Products for BAT RC-1-110GB

This manual is also suitable for:

Asi-2-210gb