AsVIVA E3 Manual page 48

Hide thumbs Also See for E3:
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY
Step 1
:
Remove the prelocking board (C) and two screws (B) from the front end of the main frame group (1).
These parts are no longer needed.
Turn the upper column assembly (44) in the direction of the arrow until it is positioned on the main
frame group (1) is located.
Hold on to the column assembly (44)! It can not standing alone in this position yet.
A second person should connect the signal line (A1-A2). To do this, the connecting terminal, loca-
ted at the end of the signal line (A1-A2), must be inserted into the large sheet metal hole (visible in
the diagram, at the end of the line A1) in the main frame group (1).
This prevents overloading of the signal line.
The plate on the upper column assembly (44) is attached to the main frame assembly (1).
Join the pieces (44) and (1) at the premade holes.
Secure the parts with screws (33) and discs (34).
48

Advertisement

Table of Contents
loading

This manual is also suitable for:

E3 pro

Table of Contents