Fisher-Price RESCUE HEROES J9555 Manual page 5

Hide thumbs Also See for RESCUE HEROES J9555:
Table of Contents

Advertisement

BUILDING THE COMMAND CENTER
2nd Floor
3
Tab
Front
of Base
Assembly
Grooves
• Position the 2nd floor between the legs, so that the long
ledge is toward the front of the base assembly.
• Fit each of the four tabs on the 2nd floor into the groove
in each of the four legs.
Hint: You will need to flex the legs apart slightly to fit the
2nd floor between the legs.
Grate
3rd Floor
4
Slots
Tabs
• Position the 3rd floor so that the grate faces the front of
the base assembly.
• Fit the slots in the 3rd floor onto the tabs on the legs.
• Push down on the 3rd floor near each slot until you hear
the four tabs "snap" into place.
Tab
Slots
PUSH DOWN
Tabs
Front of Base Assembly
3rd Floor
5
Sockets
Long
Tabs
• Position the map so that the long tabs are up right.
• At an angle, insert the long tabs on the map into the sockets
on the underside of the 3rd floor.
• Push the map forward to fit the short tabs into the grooves
in the front end of the 2nd floor.
6
Archway
Tab
3rd Floor
Tabs
Facade
Tab
• Position the archway so that the crossbeam is upright. Fit
the tabs on the archway into the slots in the 3rd floor.
• Position the facade so that the flat side is upright. Insert
and "snap" the tabs on the facade into the slots in the
front legs.
5
2nd
Floor
Grooves
Map
Crossbeam
Tab
Slots
Slots
Slots

Advertisement

Table of Contents
loading

Table of Contents