Viessmann VITOPLEX 100 Service Instructions Manual page 7

Oil/gas boiler. 780 to 2000 kw 08 to 13
Table of Contents

Advertisement

Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Commissioning the system...............................................................................................
2. Shutting down the system.................................................................................................
3. Opening the boiler door and cleaning cover...................................................................
4. Cleaning the turbulators, heating surface, flue outlet and flue pipe............................. 10
5. Checking all gaskets and packing cords on the flue gas side
6. Checking the thermal insulation components on the boiler door
7. Inserting the turbulators.................................................................................................... 10
8. Securing the boiler door and cleaning cover.................................................................. 11
9. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 12
10. Checking all connections on the heating water side and the sensor well for leaks
11. Checking the function of safety equipment..................................................................... 12
12. Checking the function of the pressure switch................................................................ 12
13. Checking the expansion vessel and system pressure................................................... 12
14. Checking electrical plug-in connections and cable grommets for firm seating
15. Checking the thermal insulation for firm seating
16. Checking the water quality................................................................................................ 13
17. Cleaning the sight glass in the boiler door...................................................................... 14
18. Checking the mixer for ease of operation and tightness............................................... 14
19. Checking the function of the return temperature raising facility (if installed)
20. Checking the installation room ventilation
21. Checking the flue pipe for tightness
22. Adjusting the burner.......................................................................................................... 14
23. Operating and service documents................................................................................... 15
Commissioning, inspection, maintenance
Page
8
8
9
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv1b

Table of Contents