Inserting the turbulators
A
10-15°
Fig. 4
Securing the boiler door and cleaning cover
Note
On gas burners, disconnect the gas supply pipe.
A
4x
Fig. 5
Screws
, boiler door
A
Screws, cleaning cover
(cont.)
B
Torque
25 Nm
7 Nm
Commissioning, inspection, maintenance
1. Push turbulators
A
approx.
hot gas flues
.
B
2. Bend turbulators approx. 10 to 15°.
3. Push the turbulators into the hot gas flues as far as
they will go. When doing this, check the pre-stress-
ing.
Note
Ensure that the turbulators cannot easily be pulled
out of the hot gas flues.
Danger
Escaping gas leads to a risk of explosion.
Check all gas connections for tightness.
Danger
Leaks can result in a risk of poisoning through
escaping gas.
Check gaskets carefully.
of their length into
¼
11