Advertisement

ADT FAQs:
ADT CellBridge™
1.
What is the ADT CellBridge and why do I need it?
Cellular technology is changing. 3G is being replaced by 4G LTE across major cellular carriers and
will eventually no longer be supported. When this occurs, your system's ability to communicate
with ADT's monitoring center will be disrupted.
The ADT CellBridge will enhance your system's cellular service from 3G to 4G LTE and keep your
system communicating. And the best part? All you have to do is plug it in!
2.
How much does the ADT CellBridge cost?
The ADT CellBridge is free! There's no extra cost for the device and your monthly service costs
won't change.
3.
How do I order an ADT CellBridge?
To determine if your system needs the CellBridge device, and to place your order, please call ADT
Customer Care at
(800)
4.
I ordered an ADT CellBridge, but it hasn't arrived. What do I do?
Your order will be shipped directly to your secured home or business. Allow 3-5 business days for
your CellBridge to arrive. If it hasn't arrived, please call ADT Customer Care at
5.
How do I install the ADT CellBridge device?
1. First, determine the placement of your CellBridge device. It should be within 25 feet of your
alarm box. This is the box with all of the system wiring. It may not be attached or near the
keypad you use to enter your system code.
The CellBridge should be:
Set on a flat surface, in an elevated location approximately 3-6 feet off the ground,
such as on top of a shelf or cabinet.
Placed with all four LED indicators and the Silence button facing upright.
Within reach of a non-switchable electrical outlet
2. Plug your CellBridge directly into an outlet. Do not plug it into an extension cord or power
strip.
Note: Lay the CellBridge on its back on a shelf or furniture (off the floor), with the lights facing
up.
3. Once a connection is made, all LED lights will turn green.
Note: This step could take 2-5 minutes (up to 15 minutes in some cases).
724-9097.
(800)
724-9097.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CellBridge and is the answer not in the manual?

Questions and answers

Summary of Contents for ADT CellBridge

  • Page 1 2. Plug your CellBridge directly into an outlet. Do not plug it into an extension cord or power strip. Note: Lay the CellBridge on its back on a shelf or furniture (off the floor), with the lights facing 3. Once a connection is made, all LED lights will turn green.
  • Page 2 ADT FAQs: ADT CellBridge™ 4. Once the lights are all green, please check your email for confirmation of a successful connection. If you didn’t receive the email, please call (800) 724-9097 or visit cellbridge.myadt.com complete the install process. 5. Once on the installation website, select the Continue button.
  • Page 3 ADT FAQs: ADT CellBridge™ 7. Once logged in or connected to your account, select the location (if you have multiple) where you’re installing the CellBridge device. Then click Continue to Next Step.
  • Page 4 There are four lights located on the top of your CellBridge device. They include Power LED, 4G LTE, 3G and Status LED. The lights on your CellBridge device could mean a few things. Here’s a helpful table to help you identify what your lights mean:...
  • Page 5 It’s asking me to test my panel. How do I do that? If ADT doesn’t receive a signal from the CellBridge device after 10 minutes, then the installation app will display a screen asking you to put your system in Test mode. Here’s how: 1.
  • Page 6 Alarm button in MyADT. Note: The alarm must sound for at least 60 seconds to ensure ADT receives the signal and can perform the test. You have 30 minutes to trigger the alarm. After that, the session will time out...
  • Page 7 ADT FAQs: ADT CellBridge™ 4. You’ll see a screen that shows your system is sending signal to ADT. Once it’s done, you’ll see a Success message. Then press the End Test button in MyADT. The system will automatically disable test mode.

Table of Contents