Glasdon ADVOCATE SIDEWALK SIGN Quick Start Manual

Advertisement

Quick Links

ADVOCATE
Assembly/Operator Instruction Leaflet
IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE

Assembling the Body to the Base

1.
Place empty base on the
ground and locate the two
body legs into the slots within
the base.
4.
Using a hammer, tap the peg
through the leg until it snaps in
place (overrides lip)and locks.
IMPORTANT: In order for this product to perform to its maximum potential the base MUST
be ballasted either with water or sand (kiln dried sand recommended).

Filling the Base with Ballast - WATER - (Unit MUST be fully assembled first)

6.
To fill with water, remove the
filler cap on the side of the
base. Ensure base is on a flat
surface.
SIDEWALK SIGN
TM
2.
Tilt the unit and lay on its side
in order to gain access to
the underneath of the base.
5.
Turn the unit over to gain access to the
other leg and repeat steps 3-4. The body
and base are now secured together.
7.
Using a hose fill the base until
water reaches the filler hole.
DO NOT over fill as there will be
no space for expansion if the
water freezes.
3.
Taking one of the two pegs
provided insert the rounded
end first into one of the holes
in the body leg.
8.
Replace filler cap.
1.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADVOCATE SIDEWALK SIGN and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Glasdon ADVOCATE SIDEWALK SIGN

  • Page 1 ADVOCATE SIDEWALK SIGN Assembly/Operator Instruction Leaflet IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE Assembling the Body to the Base Tilt the unit and lay on its side Place empty base on the Taking one of the two pegs ground and locate the two in order to gain access to provided insert the rounded...
  • Page 2 ADVOCATE SIDEWALK SIGN Assembly/Operator Instruction Leaflet Filling the Base with Ballast - SAND - (Unit MUST be fully assembled first) 4 x 50lb bags kiln dried sand To fill with sand, lay the unit on Using a funnel, pour sand its side in order to gain access through filler port until it to the fill port and...
  • Page 3 ADVOCATE SIDEWALK SIGN Assembly/Operator Instruction Leaflet To Insert/Remove a Poster (Poster Dimensions 40 x 30 inches) See step 27. Place fingers into the opening Bend the clear protector up Take the poster and push the recess at the bottom of the and over the top of the body top edge underneath the two body and pull the clear...
  • Page 4 A planned maintenance schedule of regular inspection is recommended, replacing components as necessary. n Replacement components are available direct from GLASDoN, Inc. Glasdon, Inc. n GLASDoN, Inc. cannot be held responsible for claims arising from incorrect 5200D Anthony Road installation, unauthorized modifications or misuse of the product. Sandston...

Table of Contents