OAP – Outside Air Package Units
0AP900 – OAP10000
Manufactured
Manufactured
by Armcor
by Armcor

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 0AP900 and is the answer not in the manual?

Questions and answers

Summary of Contents for Armcor 0AP900

  • Page 1 Installation and Operation Manual OAP – Outside Air Package Units 0AP900 – OAP10000 Manufactured Manufactured by Armcor by Armcor...
  • Page 2: Table Of Contents

    Contents Equipment Application Safety Location of Equipment Minimum Access Requirements for Maintenance Noise Levels Fresh Air Inlet and Exhaust Air Outlet Drainage Installation Instructions Unpacking and Inspection Unit Handling Lifting with a Crane Lifting with a Forklift Equipment Connections Ductwork Filters Electrical Requirements Mains Power Supply and Fusing...
  • Page 3: Equipment Application

    HLI. Every proposed installation must be subject to an engineered design by a mechanical service consultant. Armcor Air Solutions is not responsible for the performance of equipment in applications for which the equipment was not designed or specified.
  • Page 4: Safety

    Check with Armcor Air Solutions for any information required on this equipment. DANGER Electrical shock can cause personal injury or death.
  • Page 5: Location Of Equipment

    Location of Equipment It is important that the selected location for the equipment is suitable and can adequately accommodate the unit’s physical size, the unit weight and has safe and suitable access for correct operation and future maintenance requirements. Minimum Access Requirements Fresh Air Inlet for Maintenance •...
  • Page 6: Installation Instructions

    If damage is evident, it should be noted on the freight Wear safety goggles, work gloves, work boots and docket and contact is to be made with the Armcor protective clothing. Air Solutions sales office. A claim should be lodged •...
  • Page 7: Equipment Connections

    • The power requirement and voltage are detailed on for the specified air flow without excessive pressure the equipment technical specifications (available at armcor.com.au) and are on the identification/serial levels. The unit should be situated as close as possible to the point of use to prevent unnecessary number plate attached to each unit.
  • Page 8: Standard Equipment Layout

    Standard Equipment Layout Condensor Dumpback Damper Supply Air Fresh Air Lifting Points Forklift Supports/ Lifting Points OAP – Outside Air Package Units Installation and Operation Manual 2021...
  • Page 9: Features

    Features Oil Sight Glass TX Valve Oil should be visible during operation after the unit has All TX valves have adjustment for super heat settings. stabilised. 8-11K is acceptable for R407C and R410A gases. Compressor Control Board OAP – Outside Air Package Units Installation and Operation Manual 2021...
  • Page 10 Filter Dryer (Biflow type) Electrical Connection Must be replaced if the system is opened. Tighten all electrical connections before starting and commissioning unit. Drip Tray Drains All drains should be trapped externally to the unit. Phase Failure Fan Control Card. Relay Adjust pots for speed control of supply &...
  • Page 11: General Maintenance

    • Armcor Air Solutions are pleased to provide expert • Cleanable Filters. advice on special service maintenance requirements If filters are cleanable, they should be cleaned once a for particular installations.
  • Page 12: Warranty

    Warranty The Armcor Air Solutions Warranty Policy should be read in conjunction with the Terms and Conditions of Sale. These are available on our website armcor.com.au What The Warranty Policy Covers • Any warranty work performed by Armcor Air Solutions outside of Melbourne metro area will...
  • Page 13: Pre-Start Checklist

    Pre-start Checklist Unit Installation and Connections Check that equipment is fully installed in accordance with the installation instructions Visually check that air flows will not be obstructed Electrical Visually check all field wiring Tighten all electrical connections including all factory wiring connections Ensure supply cable is the correct size Check that required supply voltage is available on all phases Check overload settings are correct (if applicable)
  • Page 14: Commissioning Checklist

    Commissioning Checklist General Air Filters: Overall Size and Number Drain Pipe Traps and Vents fitted to Indoor Unit as per Installation Instructions Y / N Drain is Clearing Water Properly Y / N Check Vibration of Outdoor Unit OK / EXCESSIVE Check Vibration of Indoor Unit OK / EXCESSIVE Belt Tensioning Adjusted...
  • Page 15 Commissioning Checklist Performance 1 Fresh Air Temperature °C DB °C WB 2 Supply Air Temperature °C DB °C WB Notes ....................................................................................................................................................................................................................................OAP – Outside Air Package Units Installation and Operation Manual 2021...
  • Page 16 E: sales@armcor.com.au P: (03) 8301 9200 109–111 Northcorp Blvd Broadmeadows Vic 3047 © 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for possible errors and omissions in published documentation.