Download Print this page

nVent RAYCHEM Mat Installation Instructions Manual page 8

Floor heating systems

Advertisement

9. Perform insulation & resistance tests
Refer to page 11  for insulation and resistance testing procedures.
30 cm
10. Secure floor sensor probe
Refer to page 12  for sensor probe testing procedures.
Duct tape the floor sensor probe on top of RAYCHEM Mat. The probe's tip should be between the heating wires . Ensure
the probe's tip is located in an area that can represent the overall floor temperature and away from other heating/cooling
sources (i.e. heat vents, direct sunlight, drafts caused by large windows/doors, areas covered by rugs or fixed furniture).
The probe wire CAN cross on top of the heating wire(s).
8 | nVent.com

Advertisement

loading