5. ASSEMBLY SSCL1.V2
5.1.
The scaffolding must be assembled
according to this assembly and operating
manual.
5.2.
It is important to ensure that all the
necessary pins and hooks are correctly
positioned.
5.3.
The SSCL range must only be assembled
and dismantled by staff who have been
trained to follow the assembly and operating
instructions.
5.4.
Damaged elements and alternative brands
must not be used.
5.5.
Reference should be made to the diagrams
presented earlier in manual for the assembly
of elements.
5.6.
PPE (Personal Protection Equipment)
must be worn when assembling and
dismantling scaffolding.
5.7.
Elements required for raising the product
higher are hoisted on the guardrail side,
once this element has been put in place.
5.8.
Tools or other elements needed for working
on the unit must be hoisted via the
trapdoors on the platforms.
5.9.
Never stand on a platform without protection (brace) when assembling high elements (fig.6).