Download Print this page

Sealey SSCL1.V2 Quick Start Manual page 11

Platform scaffold tower en 1004, tower extension pack 3, tower extension pack 4
Hide thumbs Also See for SSCL1.V2:

Advertisement

9. PLATFORM PROTECTION
9.1.
Install the 1st platform on the 5th rung, remaining seated on the latter, and position the braces inside the uprights on the rungs as
shown in the diagram (fig.21) and assemble the 2nd platform on the 13th rung (fig.22) and install the braces and toeboards around this
platform.
9.2.
Make sure that the hooks are properly locked into the base!
fig.22
9.3.
Start from the base assembled and attach the brace to the 1st rung. Prepare the '2 rung' and '7 rung' ladders removing the pins and
stoppers from their bases.
NOTE:
fix the pins around the bottom rung of the ladder
fig.23
© Jack Sealey Limited
fig.21
Original Language Version
SSCL1.V2, SSCL3, SSCL4 Issue:4 28/06/21

Advertisement

loading

This manual is also suitable for:

Sscl3Sscl4