Warnings; Choice Of Electrical Connection - AEG COMPETENCE D4100-1 Operating Instructions Manual

Build-in electric multifunction double oven
Hide thumbs Also See for COMPETENCE D4100-1:
Table of Contents

Advertisement

WARNINGS:

This appliance must be installed by
a
qualified
person. Safety may be impaired if
installation is not carried out in
accordance with these instructions.
This appliance must be earthed.
Do not remove the screws from the
earth tab extending from the oven
mains terminal block (Fig.1).
Before connecting the appliance
make sure that the voltage of your
electricity supply is the same as that
indicated on the rating plate. This is
situated on the lower front frame of
the oven and can be seen upon
opening
Alternatively the rating plate may
also be found on the back or top of
some models (where applicable)
Do not alter the electrical circuitry of
this appliance.
CHOICE OF ELECTRICAL
CONNECTION
There are three possible ways to connect your
appliance. In each case the appliance should be
operated using at least 6mm
PVC insulated multicore cable. Please choose from
the most appropriate after reading the different
methods:-
a) By connecting the appliance to a cooker point
(having a double pole isolating switch with at least
3mm contact separation in all poles and neutral) and
protected with a fuse or miniature circuit breaker at
your mains fuse box.
Subject to Regional Electricity Company
regulations if you wish to connect the oven
and hob to the power supply you may use
one of the following two methods:-
b) By connecting the appliance together with a hob
directly to a cooker point(s). Having a double pole
isolating switch with at least 3mm contact separation
in all poles and neutral.
c) If you wish to connect an oven and a hob to a cooker
point you can by connecting the oven and hob
separately to the cooker point. Oven and hob units
should be separately connected to a control panel.
See Fig. 2.
NOTE: It is good practice to:
Fit an Earth Leakage Circuit Breaker to your house
wiring.
Wire your appliance to the latest IEE regulations.
electrician/competent
the
main
cavity
2
twin core and earth
Fig. 1
door.
Fig. 2
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Competence d4150-1

Table of Contents