Green motion PIPISTREL SKYCHARGE Technical Documentation Manual

Hide thumbs Also See for PIPISTREL SKYCHARGE:

Advertisement

Quick Links

SKYCHARGE
POWERED BY GREEN MOTION AND PIPISTREL
TECHNICAL DOCUMENTATION
NON-CONTRACTUAL PICTURES

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PIPISTREL SKYCHARGE and is the answer not in the manual?

Questions and answers

Summary of Contents for Green motion PIPISTREL SKYCHARGE

  • Page 1 SKYCHARGE POWERED BY GREEN MOTION AND PIPISTREL TECHNICAL DOCUMENTATION NON-CONTRACTUAL PICTURES...
  • Page 2: Table Of Contents

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 2 Table of content INTRODUCTION Technical Specifications Dimensions and weights INSTALLATION Mounting Wiring COMMISSIONING Opening the SKYCHARGE casing Changing the charging current eMobility Cockpit connection USAGE OF THE STATION Description of the station Charging states MAINTENANCE Troubleshooting Cleaning or replacing the filters...
  • Page 3: Introduction

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 3 1 INTRODUCTION 1.1 Technical Specifications POWER INPUT DC SKYCHARGE CHARGER Input voltage 3 x 400 V 50 Hz Input current 3 x 32 A (22 kW) Power factor > 0.99 Standby consumption < 90 W POWER OUTPUT Output power 22 kW...
  • Page 4: Installation

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 4 2 INSTALLATION 2.1 Mounting Fix the charging station on the column requires a minimum of two people. Fix the column on the concrete base with 4 threaded rods M10 according to the following diagram. Do not forget the flat washers.
  • Page 5 SKYCHARGE – TECHNICAL DOCUMENTATION Page 5 Front view: Paste the 4 seals on the back of the charging station Fix the charging station on the column with 4 stainless steel screws M6x10 and flat washers Emergency button Drill 2x Ø7 hole or push the pre-cutting hole under the cabinet and clean the metal shavings Fix with 2 stainless steel screws M6x10 with 4 serrated lock washers, 4 flat washers and 2 prevailing torque type hex lock nuts Emergency button...
  • Page 6: Wiring

    Circuit breaker at panel 2 Please be sure to install a RCD device after the C40 breaker. Green Motion strongly recommends using a Doepke RCCB DFS 4 040-4/0.03-A EV R as an RCD device or Eaton 167897 FRCDM-40/4/03-G/B. These sections must be re-assessed by the installer according to the length.
  • Page 7 SKYCHARGE – TECHNICAL DOCUMENTATION Page 7 Circuit diagram Connection Diagram: Figure 1: GB/T 18487.1-2015 Schematic Diagram of DC Charging - Extracted from AS6968 Rev.A Figure 2: GB/T 20234.3-2015 DC Charging Plug - Extracted from AS6968 Rev.A...
  • Page 8: Commissioning

    Electric shock hazard! Any operation requiring opening of the main converter box can lead to electric shock hazards. Please make sure to carefully read instructions. In case of a doubt, please immediately contact Green Motion support. 3.1 Opening the SKYCHARGE casing Use a TR20 screwdriver to unscrew the 2 screws located on the top and the bottom right side of the SKYCHARGE front door.
  • Page 9: Changing The Charging Current

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 9 3.2 Changing the charging current Electric shock hazard! Please make sure that the main power supply is turned off before trying to connect the power to the charging station. In any case, working under voltage shall be avoided. The electrical cable must reach the terminal from the left.
  • Page 10: Emobility Cockpit Connection

    The SKYCHARGE implement’s a 3G/4G/LAN router to enable the IoT connection. The router is located on the SKYCHARGE door. Router Configuration The configuration is performed on the Green Motion Manufacturing Plan Teltonika RUTX09 modem router configuration Default settings: - IP: 192.168.1.1...
  • Page 11 Authorize the management of the router from the WAN (Only if in a private network) ▪ Go to System> Administration> Access control ● Check Enable Remote HTTP and Enable Remote HTTPS (*) Please contact Green Motion SA support for the password...
  • Page 12: Usage Of The Station

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 12 4 USAGE OF THE STATION 4.1 Description of the station 1. Button indicator 2. Touch screen display 3. RFID reader 4. LED display 5. Emergency stop button To start a charge, simply connect the plane via the GB/T cable. Then press on the screen to charge the plane up to 80% or 100%.
  • Page 13: Charging States

    SKYCHARGE – TECHNICAL DOCUMENTATION Page 13 4.2 Charging states Button indicator Button Status display Comments No light Not powered or start-up stage Green light on Ready to be use or need user interaction Blue light on Charge initialization, vehicle charging, or charge finished Red light on Error in charging...
  • Page 14 SKYCHARGE – TECHNICAL DOCUMENTATION Page 14 LED display The LED display indicates the charge status. 100% LED Display Status display Comments Green light on Ready to be use Flashing green light Start-up stage Breathing green light Waiting for user interaction Flashing blue light Charge start-up stage Breathing blue light...
  • Page 15 SKYCHARGE – TECHNICAL DOCUMENTATION Page 15 Touch screen display As the touch screen display is the user interface and implements a lot of screen, please take time to read what is described and write on the screen before to operate. In this section you will find the information to start your experience.
  • Page 16: Maintenance

    Page 16 MAINTENANCE In order to prevent any technical failure, Green Motion is performing maintenance services. Please contact Green Motion Support for more information on maintenance contracts. Electric shock hazard! Please make sure that the main power supply is turned off before trying to open the charging station.
  • Page 17: Cleaning Or Replacing The Filters

    ISO COARSE 50% / G4 DIM. 161 X 397 MM 5.3 Support Green Motion telephone support is available Monday to Friday from 08:00 to 12:00 and from 13:00 to 17:00 (16:00 on Friday) CET Email: support@greenmotion.ch Tel: +41 21 544 04 46...

This manual is also suitable for:

Pipistrel skycharge solo

Table of Contents