Project Source 40017 Manual page 6

2 pk. flushmount ceiling fixture
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY INSTRUCTIONS (per fixture)
1. Tighten mounting screws (CC) two full turns into holes in
mounting strip (BB) from the side of the preassembled
green ground screw.
Hardware Used
BB
Mounting Strip
CC
Mounting Screw
2. Attach mounting strip (BB) to outlet box (not included)
using two outlet box screws (DD).
Helping Hint:
If necessary, attach copper ground wire to grounded
outlet box.
Hardware Used
BB
Mounting Strip
DD
Outlet Box Screw
3. Strip 5/8 in. of insulation from wire ends. Twist
stripped ends together with pliers (not included), black
to black (power) and white to white (neutral). Snip
ends. Thread copper wire and ground wire to green
ground screw on mounting strip (BB).
4. Attach wire nuts (AA). Tape wire nuts (AA) and wires
together. Carefully tuck wires into outlet box.
Hardware Used
Wire Nut
AA
1
x 1
CC
x 2
2
x 1
x 2
3
4
x 3
6
BB
Green
Ground
Screw
CC
DD
BB
AA

Advertisement

Table of Contents
loading

Related Products for Project Source 40017

This manual is also suitable for:

0226378

Table of Contents