Hitachi SJ2-CO Instruction Manual page 9

For sj200-2/l200-2 series inverters
Hide thumbs Also See for SJ2-CO:
Table of Contents

Advertisement

All manuals and user guides at all-guides.com
CHAPTER 2
MOUNTING METHOD OF OPTION
Note : Please move the OPE/485
dip switch bottom position
SJ2-MF
labeled "OPE".
*1
*1:The CANopen connector is connected to the bottom side of the SJ2-CO
SJ2-MF Specifications Label: See 1.5 Specifications Label
Figure 2-2 Installation of SJ2-CO (L200-2 + SJ2-CO + SJ2-MF)
Figure 2-3 Remove of SJ2-CO (SJ200-2 + SJ2-CO)
5

Advertisement

Table of Contents
loading

Table of Contents