Furuno DS-80 Installation Manual page 25

Doppler speed log
Hide thumbs Also See for DS-80:
Table of Contents

Advertisement

20. Insert the shaft so the projection on the transducer (1) fits in the groove on the flange (3).
Move the shaft up and down by hand to confirm that it moves smoothly.
21. Tighten the M16 nut (8 pcs.) on the ball valve (20).
22. Loosely fasten two sets of M8 hex. bolt (13) and M8 spring washer (14) at the top side of
the lock ring (6).
23. Fasten the M8 hex. bolt (13) tightly and the M8 spring washer (14) at the lateral side of the
lock ring (6) to fasten the shaft (5).
24. Fasten tightly two sets of M8 hex. bolt (13) and M8 spring washer (14) fastened at step 22.
25. Put the fixing plate (21) between the shaft (5) and gland (19). Fasten the plate with two sets
of M8 hex. bolt (13) and M8 spring washer (14). Check the clearance between the fixing
plate (21) and the lock ring (6). If the clearance is more than 3 mm, be sure to check that
the hollow side of the flange (3) is aligned with the projection on the transducer (1).
19

Advertisement

Table of Contents
loading

Table of Contents