Download Print this page

Horst CHC25 Assembly Manual page 5

Combine header carrier

Advertisement

STEP 3 :
A. Pin vertical adjuster bracket to right bushing on top
of axle using 5/8" drawpin (single hole toward top).
B. Secure diagonal channel to left bushing on top of axle,
and top hole on vertical adjuster bracket,
using 5/8" x 6" bolts and locknuts.
C. Pin top rail bracket to top of diagonal channel
at desired setting, using 5/8" drawpin.
STEP 4 :
A. Set 4" x 4" top rail on top rail brackets and start 1/2" U-bolts & locknuts.
Before tightening, top rail must be centered from front to back.
B. Mount adjustable shoes and strap rachet assemblies on bottom rail tube
(see shoe diagram on pg. 5 for detailed assembly instructions).
Top Rail Bracket
Vertical Adjuster Bracket
For mounting, undo these nuts to allow shoe assembly
to drop down over bottom rail tube. Hold lock handle in
locked position and tighten nuts until desired tension is acquired.
5
" Drawpin
8
Diagonal Channel
5
" x 6" Bolt
8
1
" U-bolts
2

Advertisement

loading

This manual is also suitable for:

Chc30