Advertisement

Quick Links

TOOLS REQUIRED FOR ASSEMBLY

Cordless drill and 3/8 socket adapter, Wrench and 3/8
drive Socket set, Flat head screwdriver, hack saw for
pvc pipe cutting, Tape measure.

BEFORE ASSEMBLING THE WORKBENCH

Read through the assembly instructions to familiarize
yourself with the order in which the parts are
assembled.

HARDWARE

All assembly hardware is provided.
Bolt the casters to the bottom of the cabinet.
The cabinet will be heavy and may requre
assistance lifting. Note that two types of
casters are provided. Swivel and fixed. It is
recomended that two swivel casters be
mounted on the right and fixed on the left
side of the bench.
Place (1) 5/16 X 1-3/4" Hex Bolt through
(1) 5/16" Flatwasher and stick them through
one of the holes in the caster.
Stick the bolt and washer through one of
the holes through the bottom of the cabinet.
On the other end place (1) 5/16" Flatwasher onto the Hext
Bolt. Screw (1) 5/16" Locknut onto the Hex Bolt tighting the
caster to the cabinet bottom.
Repeat steps 1-2 for all four holes on the caster and then
repeat again for each caster that is to be connected to the
cabinet.
Locknut
Flatwasher
Flatwasher
Hex Bolt
Cabinet
5/16"
Flathead Washer
5/16 X 1-3/4"
Hex Bolt
MG VAC BENCH

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MG VAC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GMI MG VAC

  • Page 1 MG VAC BENCH TOOLS REQUIRED FOR ASSEMBLY Cordless drill and 3/8 socket adapter, Wrench and 3/8 drive Socket set, Flat head screwdriver, hack saw for pvc pipe cutting, Tape measure. BEFORE ASSEMBLING THE WORKBENCH Read through the assembly instructions to familiarize yourself with the order in which the parts are assembled.
  • Page 2 PLACE WORKSURFACE ON BASE. ALIGN TOP SO THAT 1" OVERHANGS THE FRONT AND 2" TO EACH SIDE. LEAVING 5" OVERHANG AT THE REAR OF THE STATION.ATTACH WORK SURFACE TO BASE USING #14X1 LAG BOLTS Before mounting the top down, ensure the cabinet is square.
  • Page 3 INSERT T-FITTING THROUGH THE CUTOUT IN THE WORK SURFACE FROM THE UNDER SIDE AND ATTACH TO VAC COVER PORT FROM THE TOP SIDE BY TIGHTENING THE PIPE CLAMP WORM GEAR. REPEAT THIS FOR 96 AND 108 UNITS THAT HAVE 3 TOP PORTS.
  • Page 4 VACUUM CONNECTION MG-72 /78: INSTALL THE 8" PVC LENGTH TO THE OPPOSITE (VAC SIDE) OF THE T-FITTING AND TIGHTEN THE WORM GEAR TO SECURE. NEXT SECURE THE REDUCER TO THE OTHER END OF THE 8” PVC. SECURE WITH WORM GEAR CLAMP.
  • Page 5 INSTALL THE REAR PLUMBING COVER AS SHOWN USING #10 X 3/4" SPAX WOOD SCREWS.

Table of Contents