Setup; Installing The Boom And Chain - Toro TRX-15 Operator's Manual

Trencher
Hide thumbs Also See for TRX-15:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
1

Installing the Boom and Chain

Parts needed for this procedure:
1
Boom
1
Chain
Procedure
Important: There are several boom and chain size
configurations available. Refer to you Authorized
Service Dealer to obtain the appropriate boom and
chain to meet your requirements.
1. Stop the engine and remove the key.
2. Remove the bolt and nut securing the spoils auger
and remove the auger (Figure 3). Save the bolt and
nut for future use.
Description
Boom
Chain
No parts required
No parts required
Qty.
1
Install the boom and chain.
1
Check the fluid levels.
Charge the battery.
1. Spoils auger
2. Boom
3. Bolts
4. Double washer
5. Nuts
3. Remove the 2 bolts, nuts, and double washers from
the sides of the boom (Figure 3).
4. Loosen the adjusting bolt and jam nut (Figure 3).
5. Slide the boom over the arm on the drive head.
6. Install the 2 bolts, nuts, and double washers removed
in step 3 through the boom and arm, but do not
tighten them.
7. If the chain is not connected, connect the links by
pressing or hammering the clevis pin supplied with
the chain through the links.
Important: To avoid bending the chain links,
place blocks under and between the links when
hammering the clevis pin through.
8. Secure the clevis pin with the cotter pin supplied
with the chain.
11
Use
Figure 3
6. Adjusting bolt
7. Jam nut
8. Arm on the drive head
9. Drive sprocket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trx-192297022971

Table of Contents