Periods Of Inactivity; Ordinary Maintenance - ILVE IAG User's And Installer's Manual

Table of Contents

Advertisement

PERIODS OF INACTIVITY

ORDINARY MAINTENANCE

PROCEDURE
TO FOLLOW
When not using the equipment for extended periods of times:
disconnect the equipment from the power supply.
if possible, use a soft cloth to apply a thin layer of Vaseline oil to all stainless steel
surfaces.
At first use:
accurately clean the equipment;
reconnect the power supply
- replacement of the spotlight
ALWAYS MAKE SURE THAT THE APPLIANCE IS DISCONNECTED FROM THE NETWORK
1-2. Remove the metal filters
3. Press the tabs and push the spotlight outwards
4. disconnect and replace the entire spotlight
13
1
2
USER
Fig. 5.
Fig. 6.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iag90Iag120Iag150Iag90/ssIag00006

Table of Contents