Lennox Allied Air A80DF Installation Instructions Manual page 33

Warm air gas furnace downflow air discharge
Table of Contents

Advertisement

16. Reinstall collector box and combustion air assembly.
Reinstall all screws to the collector box and combustion
air inducer. Failure to replace all screws may cause
leaks. Inspect gaskets for any damage and replace if
necessary.
17. Reinstall burner box, manifold assembly and burner
box cover.
Figure 31. NOx Inserts
Figure 32. Remove 5 Screws if Necessary
507327-01
18. Reconnect all wires.
19. Reconnect top cap and vent pipe to combustion air
inducer outlet.
20. Reconnect gas supply piping.
21. Turn on power and gas supply to unit.
22. Set thermostat and check for proper operation.
23. Check all piping connections, factory and field, for gas
leaks. Use a leak detecting solution or other preferred
means.
Some soaps used for leak detection are corrosive to
certain metals. Carefully rinse piping thoroughly after
leak test has been completed. Do not use matches,
candles, flame or other sources of ignition to check for
gas leaks.
24. If a leak is detected, shut gas and electricity off and
repair leak.
25. Repeat steps 24 and 26 until no leaks are detected.
26. Replace access panel.
Planned Service
The following items should be checked during an annual
inspection. Power to the unit must be shut off for the
service technician's safety.
Fresh air grilles and louvers (on the unit and in the
room where the furnace is installed) - Must be open and
unobstructed to provide combustion air.
Burners - Must be inspected for rust, dirt, or signs of water.
Vent pipe - Must be inspected for signs of water, damaged
or sagging pipe, or disconnected joints.
Unit appearance - Must be inspected for rust, dirt, signs of
water, burnt or damaged wires, or components.
Blower access panel - Must be properly in place and
provide a seal between the return air and the room where
the furnace is installed.
Return air duct - Must be properly attached and provide
an air seal to the unit.
Operating performance - Unit must be observed during
operation to monitor proper performance of the unit and
the vent system.
Issue 1809
CAUTION
Page 33 of 34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Allied air 80g1df

Table of Contents