Lennox Allied Air A80DF Installation Instructions Manual page 11

Warm air gas furnace downflow air discharge
Table of Contents

Advertisement

Cabinet
Catalog
Width
Number
B Cabinet
11M60
(17.5")
C Cabinet
11M61
(21")
Table 2. Combustible Flooring Base Opening Size
Figure 12
2.
After opening is cut, set the combustible flooring base
into opening.
3.
Check fiberglass strips on the combustible flooring
base to make sure they are properly glued and
positioned.
4.
Lower supply air plenum into the combustible flooring
base until plenum flanges seal against fiberglass
strips.
NOTE: Be careful not to damage fiberglass strips.
Check for a tight seal.
5.
Set the furnace over the plenum.
6.
Ensure that the seal between the furnace and plenum
is adequate.
Installation on Cooling Coil Cabinet
See Figure 13
NOTE: Downflow combustible flooring kit is not used.
1.
Refer to reverse flow coil installation instructions for
correctly sized opening in floor and installation of
cabinet.
2.
When cooling cabinet is in place, set and secure the
furnace according to the instructions that are provided
with the cooling coil. Secure the furnace to the cabinet.
3.
Seal the cabinet and check for air leaks.
507327-01
Front to
Side to Side
Rear
in.
mm
in.
mm
22
559
18-3/4
476
22
559
22-3/4
578
Return Air Opening - Downflow Units
Return air may be brought in only through the top opening of
a furnace installed in the downflow position. The following
steps should be taken when installing plenum:
1.
Bottom edge of plenum should be flanged with a
hemmed edge (See Figure 14 or 15).
2.
Sealing strips should be used to ensure an airtight
seal between the cabinet and the plenum.
3.
In all cases, plenum should be secured to top of
furnace using sheet metal screws.
4.
Make certain that an adequate seal is made.
Issue 1809
Figure 13
Figure 14
Figure 15
Page 11 of 34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Allied air 80g1df

Table of Contents