ABB Sentry USR22 Product Manual page 33

Safety relays
Hide thumbs Also See for Sentry USR22:
Table of Contents

Advertisement

CH1
green
off
off
green
green
green
fast flash green
fast flash green
off
off
2TLC010073M0201 Rev.G
Mode
CH2
flash green
off
blue
off
blue
green
blue
off
blue
green
blue
fast flash green
blue
green
blue
fast flash green
flash blue
off
flash blue
green
Status
Action
CH1 accepted and
CH2 unaccepted.
A timer function
is counting down
while the safety
relay remains
activated.
No channels
Check CH1 and
accepted
CH2
CH1 unaccepted,
Check CH1
CH2 accepted
CH1 accepted,
Check CH2
CH2 unaccepted
CH1 and CH2
Check reset
accepted, the
settings, wiring
safety relay wait
and reset circuit
for reset
Two-channels
Check
error: CH2 has
installation.
been unaccepted
Restore by
and then
opening and
accepted again
closing both CH:s
while CH1
at the same time
remained
accepted
Two-channels
Check
error: CH1 has
installation.
been unaccepted
Restore by
and then
opening and
accepted again
closing both CH:s
while CH2
at the same time
remained
accepted
Reading error on
Check
R1 and R2
installation.
Restore by
opening and
closing both CH:s
at the same time
CH1 and CH2
unaccepted, a
timer function is
counting down
while remaining
inactivated
CH1 unaccepted
and CH2
accepted, a timer
function is
counting down
while remaining
inactivated
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Usr10

Table of Contents