Download Print this page

Hardware Installation Checklist - Dell EMC VxFlex Ready Node 14G Inspection Manual

Hide thumbs Also See for EMC VxFlex Ready Node 14G:

Advertisement

Maintenance

Hardware installation checklist

Maintenance
4
Check the sensors.
l
Enable the disk utility.
l
Verify the drive status.
l
Prepare the hardware for failure analysis, if necessary.
l
This section includes a hardware checklist to be used by the CE.
It is the CE's responsibility to complete this checklist.
Customer Name:
Customer Location:
Installation Type:
Install Start Date:
VxFlex OS Hardware Info
VxFlex OS Node Type
Network Equipment:
Packaging Issues:
Item
Missing rails/screws/docs
Physical damage to node
Physical damage to switch
Other
Hardware Checks (prior to powering on the server)
Item
Server/node can move freely
on rails
PSU seated (reseat if loose)
Power-cords secured with
retaining clips
☐ New Installation
☐ Add-On
☐ Revisit
☐ Other (specify) ___________________
Install End Date:
Check all that apply:
☐ 1U1N Qty:
☐ 2U1N Qty:
☐ Mgmt. Server
☐ Mgmt Switch Qty:
☐ Data Switch Qty:
☐ Mgmt. Server
Observation
Observation
CE Name:
Notes
Notes

Advertisement

loading