Toshiba SUPER MMK-AP0073HP-E1 (TR1) Service Manual page 7

Table of Contents

Advertisement

5. Recharge of Refrigerant
When recharge of the refrigerant is required, charge the new refrigerant with the specified amount in
the procedure as described below.
Recover the refrigerant and check there is no refrigerant in the
equipment.
Connect the charge hose to the packed valve service ports at gas
side, liquid side, and balance side of the outdoor unit.
Connect the charge hose to vacuum pump adaptor.
Open the packed valves of the balance pipe fully at liquid and gas
sides, and then return the valve at gas side a little to the closed side.
Open fully PMV of the outdoor unit.
• Turn on power of the outdoor unit.
• Short CN30 on I/F P.C. board of the outdoor unit.
• Turn off power of the outdoor unit within 2 minutes after short-circuiting.
Open fully the handle Low of the gauge manifold, and then turn on
the power of vacuum pump for vacuuming.
1) Never charge the refrigerant over the specified amount.
2) Do not charge the additional refrigerant.
If charging refrigerant additionally when refrigerant gas
leaks, the refrigerant composition in the refrigerating
cycle changes resulted in change of air conditioner
characteristics or refrigerant over the specified standard
amount is charged and an abnormal high pressure is
applied to the inside of the refrigerating cycle resulted in
cause of breakage or injury.
1) Set the equipment so that liquid refrigerant can be charged.
2) When using a cylinder with siphon pipe, liquid can be charged without inversing the cylinder.
[ Cylinder with siphon ]
Gauge manifold
Refrigerant
cylinder
Electronic
balance
6. Environment
Use "Vacuum pump method" for an air purge (Discharge of air in the connecting pipe) in installation time.
• Do not discharge flon gas into the air to protect the earth environment.
• Using the vacuum pump method, clear the remained air (Nitrogen, etc.) in the unit. If the air remains, the pres-
sure in the refrigerating cycle becomes abnormally high and an injury and others are caused due to burst.
[ Cylinder without siphon ]
Gauge manifold
OUTDOOR unit
Electronic
balance
When the pressure has lowered until indication of the
compound gauge pointed -0.1MPa (–76cmHg), open fully the
handle Low and turn off the power of vacuum pump.
Leave it as it is for 1 to 2 minutes and check the indicator of
the compound gauge does not return.
Set the refrigerant cylinder on the electron balance, connect
the charge hose to connecting ports of the cylinder and the
electron gauge, and then charge the liquid refrigerant from the
service port at liquid side. (Shield with the gauge manifold so
that refrigerant does not flow to gas side.)
(Charge the refrigerant as below.)
Connected to
Valve fully closed
indoor unit
(gas side)
Main
pipe
Brazed
Fully
tightened
Valve fully closed
(liquid side)
Connected to other
terminal units
4mm-hexagonal wrench is required.
OUTDOOR unit
R410A refrigerant is consisted with HFC mixed refrigerant.
Therefore if the refrigerant gas is charged, the composition
of the charged refrigerant changes and characteristics of
the equipment changes.
7
FILE NO. SVM-14077
Low-
High-
pressure gauge
pressure gauge
V
V
L
H
Center unit
Service
Reducing
port
valve
Ø6.4
Copper pipe
Service port
Ø6.4
Copper pipe
Siphon
Gauge
manifold
Nitrogen
gas

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents