PROGRAMMING (SWITCH BOX TIMER, AND TIMER + PG)
After starting the power supply there is a short delay while the system starts up. Once the
screen has turned on, press Menu
main menu press Menu . The icons below represent the buttons.
TO PROGRAM THE DATE AND TIME
Press Menu
to enter the programming mode, then use Down
(6 clicks down), then press Enter . Select date in the format DD/MM/YYYY and 24hr clock
as displayed.
To change the date and time, use Up
selection with Enter
have confirmed the minutes with Enter , the program will change automatically to the
main screen PROGRAMMING MODE.
TO PROGRAM A LINE
Press Menu
to get to the programming menu. The five lines are automatically labelled
1-5. Use Up
and Down
Choose a device description (see list on next page) with Up
options. The line will be renamed with selected device name. Press Enter
Each line can have up to five different program time slots which are labelled "a" through to
"e". Use Up
to turn a program slot on, a check mark will appear to show that a program
slot is being set. Press Enter
Use Menu
at any point to move back through the options. When you have finished
programming, press Enter
The screen will display a large TICK
have been recorded.
When a line switches on, the light on the Switch Box will illuminate to show the
line is on.
to display the programming menu. To return to the
MENU
ENTER
and Down
and move on. Press Menu
to select a line and press Enter .
to proceed to set 'on' and 'off' times with Up
repeatedly to scroll through the remaining program slots.
to confirm that program slot changes
UP
DOWN
to select the clock icon
to change number displayed. Confirm
at any point to move back. When you
and Down
through device
to select one.
and Down .
1 1