Installation Instruction - LG PQCSD130A0 Installation Manual

Function scheduler for air conditioner
Hide thumbs Also See for PQCSD130A0:
Table of Contents

Advertisement

Installation instruction

1. Connect Function Scheduler
cable to Function Scheduler
installation board as shown in the
right picture.
12V
SIG
GND
j Function Scheduler cable is connected as factory default.
2. After fixing the cable to the guide
slot, attach Function Scheduler
installation board at the desired
location.
• Before fixing Function Scheduler cable to the
guide slot, remove any clogged part of the
case in the direction to install before the
installation.
3. After locating Function Scheduler
installation board at the desired
location, screw the unit firmly.
(When there is a buried box,
install Function Scheduler board
to fit the buried box.)
• Use the screws provided.
Red wire
Yellow wire
Black wire
installation board>
12V SIG GND
Red
Yellow
Black
<Front side of
Top
Fixate Function
Scheduler cable
to the guide slot.
Installation board
Bottom
Ownerʼs & Installation Manual 7
Installation instruction
Function
Scheduler cable
Guide slot
<Rear side of
installation board>
Wall
Use the screws
Side
for fixate the unit
firmly on the wall.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents