Connection Method Of Function Scheduler - LG PQCSD130A0 Installation Manual

Function scheduler for air conditioner
Hide thumbs Also See for PQCSD130A0:
Table of Contents

Advertisement

Connection Method of Function Scheduler

Turn off the power before the connection of Function Scheduler.
1
Connect colored cable of Function Scheduler to the corresponding terminal block of CN_REMO on the
PCB of the central controller.
Central controller
Function controller
CN_REMO
RD terminal (12V)
YL terminal (signal)
BR terminal (GND)
2
Connect yellow wires and black wires to the corresponding terminal of the central controller CN_REMO
respectively as right where the central controller is installed the following figure.
The group address of central controllers must be set between 0 and 7.
3
Close the central controller case and check operation after turning on the power.
Caution
1. Use the communication cable provided with Function Scheduler.
2. Use 3P-0.75 Square Shield wires where cable extension is required.
3. Install cable length is within 1m.
4. If wiring is not proper, the product may be damaged or not operate when power is applied.
cable
Red
Yellow
BR YL
BR
YL RD
Black
RD
Ownerʼs & Installation Manual 9
Installation instruction

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents