SAFETY & WARNINGS Warning: Only for domestic outdoor use. This playset satisfies all the requirements of the Australian standard AS/NZS ISO 8124 and has been certified by an independent laboratory. To guarantee safety, please give special attention to the assembly, safety, and care instructions detailed in this document.
Page 4
General statements Please familiarise yourself with the installation manual, parts/components and general construction process of your new swing set before getting started. Approximate assembly time: 6 to 8 hours. 2 metre unobstructed safety perimeter around swing set recommended. This play set is designed for children 3-14 years old and for the use of: •...
Page 5
IMPORTANT! For safety reasons, your play set must be embedded into the ground. • Place your play set in the desired position and mark a square area 350mm x350mm around each of the feet. Dig holes 350mm deep. The feet must be in the centre of the square.
Page 7
Fasteners B131 Hex Head Bolt 5/16" B132 Hex Head Bolt 5/16" x S06 Lag Bolt 1/4" x 2" (x12) x 2 1/4" (x4) 3 3/4" (x12) S65 Phillips Pan Head B91 Hex Head Bolt 5/16" S95 Phillips Wood Screw #8 Machine Screw 1/4"...
ASSEMBLY NOTES Additional Tools Required for Assembly Tape Measure 610mm Level Angle Square Cordless Drill or Electric 10mm Drive Ratchet or Phillips Screwdriver Drill Electric Impact Gun Claw Hammer or Rubber Pliers or Vise Grips 11mm Deep Well Socket Mallet 3mm, 6mm, 14mm and Drill 14mm Deep Well Socket 19mm Deep Well Socket...
Page 10
your swing set from. We appreciate your purchase and know that you will enjoy your play system for many years to come. Important note: Wood has some natural defects such as knots, surface cracks, etc. We reject parts that are structurally defective. We use a high-quality timber in our structures; however, you should inspect each part for splinters or rough spots and sand them smooth to prevent injury.
Page 11
With a shovel, score the ground around the outside edges of the sandbox boards on the 'high' side of the fort. This is the area that will be dug in. Make sure to score deep enough; the scored lines will be your digging template. Push the frame off and away from the scored area, far enough to dig and remove dirt to reach the appropriate depth.
Page 16
Step 5: After installing the two side deck boards 280010, there should be no gap between side 280010 and 280012/280017, all other deck boards (280010/280020) should be evenly distributed.
Page 20
Step 9: After installing the two side boards 280016/280018, there should be no gap between 280016/280018 and 280012 , all other boards (280016/280018) should be evenly distributed.
CLEANING & CARE • All parts should be checked at least once a month. • Check all nuts and bolts for tightness and tighten when required. • Check for signs of wear to bolt coverings. If sharp edges are found, replace as required. •...
Page 33
Need more information? We hope that this user guide has given you the assistance needed for a simple set-up. For the most up-to-date guide for your product, as well as any additional assistance you may require, head online to help.kogan.com...