Attach Side Assy. Channel; Cover Lifter Installation; Attach Extension Tube To Cover - Watkins Wellness UPRITE Installation Manual

Cover lifter
Table of Contents

Advertisement

UPRITE COVER LIFTER INSTALLATION
STEP 2

ATTACH SIDE ASSY. CHANNEL

1. Locate previously mark made over the
aluminum plates of the side of the cover
set. Align mark on the side Side Assembly
Channel (C) to the mark made on the side of
the cover set (Figure 3.1).
2. Using the (4) holes on the side Assembly
Channel as a template, mark the location of
the (4) holes (Figure 3.1).
All (4) holes must be positioned over the
aluminum plate, which is located under
the Vinyl.
3
1. Pre-Drill holes 1/8" (3mm) by 1/2" (12.5 mm)
max depth (Figure 3.1).
Spacers (Z) will be required in the following
steps. Spacers (Z) are provided in Bag #5.
All spacers come with pre-drilled holes
1. Make sure to align Channel (C) and Spacer
4
(Z), secure Side Assembly Channel (C) to
cover set using (4) 1-1/2" Flat Head Screws
located in Bag #1 (Figure 3.1) Make sure
screws are seated completely into the
countersunk holes of the Side Assembly
Channel (C)
Repeat this step on the Right side of cover.
7
Z
C
2
Figure 3.1
D
STEP 3

ATTACH EXTENSION TUBE TO COVER

1. Locate both Right Extension Tube (E)
and Left Extension Tube (M). Assemble
Extension Tubes and Angle Brackets as
shown in (Figure 4.1).
4X
S
M
2X
R
1. Locate the (Left) Extension Tube Assembly
(Green dot = Left, Red dot = Right)
2. Slide the (Left) Extension Tube Assembly into
3
the Side Assembly Channel (C) (Figure 4.1).
C
R
4X
Figure 3.2
E
Figure 4.1

Advertisement

Table of Contents
loading

Table of Contents