◆ Parallel Installation of Multi-units
1 0 0 0
>
3 8 0 0
Caution!
1. Intense magnetic field, high saline and alkaline land, the sites of high acid or extreme
voltage instability are not suitable for the unit.
2. Make sure that the way of moving in is correct in case any damage to the unit or any
danger occurred.
3. Confirm whether the installation base is secure and when the unit is installed on the
metal part of a building, electric insulation and complying with relative technology
standard have to be confirmed.
4. Confirm the site of installation is far away from the flammable, explosive Substance in
case any explosion or fire hazard caused by the leak of them.
6.4

Requirements of Installation

Produced in the strict quality management system of our company, tested strictly, and
GREE Air-ccoled Closed Control Unit Service Manual
2 0 0 0
>
Ground
Horizontal Installation of Multiple Units
2 5 0 0
Ground
Vertical Installation of Multiple Units
28
1 0 0 0
>
1 0 0 0