EC-10, EC-20, EC-40, and
Total Eclipse 2 & 4
4-0635 Rev.M

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MDV and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Del ozone MDV

  • Page 1 Mixing Degas Vessel Installation Manual for MDV EC-10, EC-20, EC-40, and Total Eclipse 2 & 4 4-0635 Rev.M...
  • Page 2 1. Follow ozone generator mounting and electrical connection instructions in Eclipse manual. 2. Mount the MDV vertically as shown in Figure 1 to a solid surface (i.e. fence, wall, post) using the (2) cable ties, (4) cable tie mounts, and (4) screws included. Use a pair of pliers to tighten and secure the cable tie.
  • Page 3 Valve may be closed slightly to raise the level. However, this may impair injector performance at higher speeds. Verify proper operation under all conditions. 3. Streams of gas bubbles should be rising to the top of the MDV, and the water returning to the pool should be virtually bubble free.
  • Page 4 SECTION 6. Replacement Parts 1. Follow ozone generator mounting and electrical connection instructions in Total Eclipse manual. 2. Mount the MDV vertically as shown in Figure 2 to a solid surface Hose Clamp for 1/4” ID tubing 2-0078 (i.e. fence, wall, post) using the (2) cable ties, (4) cable tie Check Valve and Tubing Assembly 9-0770-01 mounts, and (4) screws included.
  • Page 5 MDV, but not filling up the tower. 2. Adjust the Level Control Ball Valve until the water level inside the MDV is near the top of the intersection of the clear PVC tower and the molded top cap. 3. Restart then shut down the pool’s main circulation pump several times, ensuring that the water level in the tower remains at the top of the tower both when the main circulation pump is on and off.
  • Page 6 After this information is provided, DEL Ozone may release a RETURN GOODS AUTHORIZATION (RGA) NUMBER. After receiving the RGA number the part in question must be returned to DEL Ozone, freight prepaid, with the RGA number clearly marked on the outside of the package. All preauthorized defective parts must be returned to DEL Ozone within thirty (30) days.
  • Page 7 3580 Sueldo Street, San Luis Obispo, CA 93401 (800) 676-1335 o3info@delozone.com www.delozone.com EPA Estab. No. 071472-CA-001...