Download Print this page

Advertisement

SP230
priorityswitch
your priority line
User Guide
NDS ENERGY s.r.l.

Via Pascoli, 169

65010 Cappelle sul Tavo (Pe) Italy

Tel.:+39 085 4470396 | Cell/whatsapp: +39 373.88.86.875

fax: +39 085 9507049

web: www.ndsenergy.it

1
email: commer@ndsenergy.it

Advertisement

loading
Need help?

Need help?

Do you have a question about the Priority Switch and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NDS Priority Switch

  • Page 1 SP230 
 priorityswitch your priority line User Guide NDS ENERGY s.r.l.
 Via Pascoli, 169
 65010 Cappelle sul Tavo (Pe) Italy
 Tel.:+39 085 4470396 | Cell/whatsapp: +39 373.88.86.875
 fax: +39 085 9507049
 web: www.ndsenergy.it
 email: commer@ndsenergy.it...
  • Page 3: Table Of Contents

    Indice Introduction FEATURES LED explanation installation Technical specifications Warranty...
  • Page 4: Introduction

    Introduction PrioritySwitch, a smart device that can use the inverter and batteries only when needed. is a useful system for managing the 230V voltage when both, power supply and inverter, connected to the batteries, are available. 
 PrioritySwitch will handle the two power sources, always prioritizing the grid.
  • Page 5 • The information contained in this manual could be changed without notice. NDS Energy s.r.l. reserves the right to make changes and improvements to the product at any time without notice and without obligation to apply these changes to the devices previously distributed.
  • Page 6: Features

    FEATURES PrioritySwitch selects for you the best available power source (grid 230Vac, or inverter) in a fully automated way, saving your service battery from overload power requests. PrioritySwitch is designed to power the various utilities that need 230VAC voltage, the grid will always have maximum priority.
  • Page 7: Installation

    installation Install the device, as shown in Fig. 1, respecting the following instruction: N (blue color connection) = neutral l (Brown color connection) = Phase yellow / green connection = ground fig. 1...
  • Page 8 230vac utilities distribution 230vac with inverter e priority switch utilities inverter fridge differential battery charger...
  • Page 9: Technical Specifications

    Technical specifications description technical specifications nominal voltage 230 v nominal frequency 50/60Hz maximum power 3,000w maximum current size 144 x 128 x 48,5h weight 615 g...
  • Page 10: Warranty

    Warranty warranty coupon 
 model__ _____________________________________________________________________ serial____ ___________________________________________________________________
 selling date__ ______________________________________________________________ stamp and signature NDS ENERGY S.r.l. email: commer@ndsenergy.it Via G. Pascoli, 169 phone: +39 085 4470396 65010 Cappelle sul Tavo (PE) fax: +39 085 9112263 Italy 
 
 
...
  • Page 12 Tutta l’energia che ti serve all the energy you need NDS ENERGY s.r.l.
 Via Pascoli, 169
 65010 Cappelle sul Tavo (Pe) Italy
 Tel.:+39 085 4470396 | Cell/whatsapp: +39 373 8886 875
 fax: +39 085 9507049
 web: www.ndsenergy.it
 email: commer@ndsenergy.it like us on...

This manual is also suitable for:

Sp230