Do you have a question about the MRF-314W-BS and is the answer not in the manual?
Questions and answers
Elizabeth Setney
March 22, 2025
will it run on 110 current
1 comments:
Mr. Anderson
March 22, 2025
No, the Cannon MRF-314W-BS should not be connected to an AC power supply, including 110V. It operates on a low-voltage DC power source.
This answer is automatically generated
Yves Pelletier
July 24, 2025
I need to replace the freezer door gasket on model MRF-314W-BS
What is the part number and the dimensions of the freezer seal?
Thank you
Summary of Contents for Cannon MRF-314W-BS
Page 1
Built-in Vehicle FROST-FREE REFRIGERATOR-FREEZER INSTRUCTION MANUAL Model No.: MRF-314W-BS Dear users, this manual contains the product's basic knowledge, how to use it, fault diagnosis and basic troubleshooting methods. In order to better understand and use this product, please take good care of this manual, and read...
ONTENTS ....................... 4 MPORTANT SAFETY INSTRUCTIONS .......................... 7 EATURES AND PARTS III. P ........................7 REPARATIONS FOR USE IV. F ............................8 UNCTIONS ....................10 NSTRUCTIONS FOR FOOD STORAGE VI. T ........................11 IPS FOR SPECIAL NEEDS VII. M ......................11 AINTENANCE AND CLEANING VIII.
Important safety instructions ARNINGS Read these instructions. Keep these instructions. Heed all warnings. Follow all instructions. Do not use your refrigerator near water. Clean only with a damp cloth. Do not block any ventilation openings. Install in accordance with the manufacturer's instructions. Do not install near any heat sources, such as radiators, heat registers, stoves, or other apparatus (including amplifiers) that produce heat.
Page 4
• Take off the door. • Leave the shelves in place so that children may not easily climb inside. 7. WARNING-Do not use electrical appliances inside the food storage compartments of the appliance unless they are of the type recommended by the manufacturer. 8.Power source disconnected your refrigerator before carrying out user maintenance on it.
Page 5
IRE CONNECTION DIAGRAM Connect ① terminal with Positive pole of 12V DC. Connect ② terminal with Negative pole of 12V DC. If the unit is installed in an RV, the ③GND terminal should be connected directly to the RV CHASS.S.
Features and parts Due to technological innovations, the product descriptions in this manual may not be completely consistent with your refrigerator. Detailed information is in accordance with the final product. Preparations for use Installation location: Ventilation condition The position you select for the refrigerator installation should be well-ventilated and has less hot air. Do not locate the unit near a heat source such as cooker, and avoid it from direct sunlight, thus guaranteeing the refrigerator effect while saving energy consumption.
Unobstructed ventilation shall be maintained around the unit or in an embedded structure. Preparations for use Standing time After the refrigerator is properly installed and well cleaned, do not switch it on immediately. Make sure to energize the refrigerator after more than 1 hour's standing, so as to ensure its normal operation. Cleaning Confirm the accessory parts inside the refrigerator and wipe the inside with a soft cloth.
Page 8
3) Exit the "Battery Test" function: After the "Battery Test" function is activated, it will automatically get exited after displaying the battery level for 30s. 4) After the “Battery Test” function is enabled, the current input voltages of the refrigerator will be indicated as below: Voltage values Indicators “Fast Cool”...
Fault Display Item Information Fridge sensor fault Indicator light “5” keeps flashing; (On for 0.5s, and Off for 0.5s)) Freezer defrosting sensor fault Indicator light “3” keeps flashing; (On for 0.5s, and Off for 0.5s)) Communication fault Indicator light “2” keeps flashing; (On for 0.5s, and Off for 0.5s)) Ambient temp.
freezer compartment, but the storage duration indicated on the food packaging should be adhered to. The freezer drawers are used to store food that needs to be frozen. Fish and meat of large block size should be cut into small pieces and packed into fresh-keeping bags before they are evenly distributed inside the freezer drawers. Energy saving tips ·Let hot foods cool to room temperature before placing in the refrigerator.
of power supply or failure of the refrigerating system). •Try to open the refrigerator door as least as possible, this way food can safely and freshly be kept for hours even in hot summer. •If you get the power outage notice in advance: Adjust the thermostat knob to the high mode an hour in advance, so that foods get fully frozen (Do not store new food during this time!).
Page 12
Note: If the above descriptions are inapplicable to troubleshooting, do not disassemble and repair it yourself. Repairs carried out by inexperienced persons may cause injury or serious malfunctioning. Contact the local store where your purchase was made. This product should be serviced by an authorized engineer and only genuine spare parts should be used.
Need help?
Do you have a question about the MRF-314W-BS and is the answer not in the manual?
Questions and answers
will it run on 110 current
No, the Cannon MRF-314W-BS should not be connected to an AC power supply, including 110V. It operates on a low-voltage DC power source.
This answer is automatically generated
I need to replace the freezer door gasket on model MRF-314W-BS What is the part number and the dimensions of the freezer seal? Thank you