Tooling Setup
Before operating the welder, the tooling must be installed, and the thruster properly positioned on the support column.
Any fixture manufactured by a third party must comply with all OSHA and
ANSI requirements. All fixtures must be guarded as necessary. Dukane does
not assume any responsibility or liability for fixtures manufactured by the
Attaching the Fixture on the Base
If the fixture is not mounted to the base, follow these instructions, referring to the illustration below:
1. Place the fixture on the base.
2. Initially align the two slots in the fixture over two of the eight mounting holes on the base.
3. Install the two fixture hold-down bolts with hardened washers, as shown in Fig. 4-1, but leave the bolts
loose at least 1 turn.
Infinity™ Series Servo Ultrasonic Press Systems QUICK START GUIDE
WARNING
customer or any third party manufacturer.
Figure 4-1 Placing the Fixture on the Plate
18